City of McGehee (AR)
Spot something wrong?
These change with code cycles. If a requirement here is out of date or missing, tell us and we'll fix it.
Report a correction NEC Code Version2017
Wet Stamps RequiredNone
Fire Setback EnforcedNo
Codes
- NEC Code Version
- 2017
- Code List
2012 ARKANSAS FIRE PREVENTION CODE 2017 NATIONAL ELECTRIC CODE 2006 ARKANSAS STATE FUEL GAS CODE 2006 ARKANSAS STATE PLUMBING CODE 2010 ARKANSAS STATE MECHANICAL CODE 2014 ARKANSAS STATE ENERGY C
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- No
- New Planset Required For Module Swap
- No
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- None
- Structural Calculations Required
- No
Fire setbacks
- Fire Setback Enforced
- No
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 90
- Snow Load
- 10
- Reducible Snow Load Allowed
- Yes
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- No
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Line Side Taps,Load Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- No
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim