Town of Coy (AR)

Arkansas Authority Having Jurisdiction Solar permitting requirements

Spot something wrong?

These change with code cycles. If a requirement here is out of date or missing, tell us and we'll fix it.

Report a correction
NEC Code Version2020

Codes

NEC Code Version
2020
Code List

2021 ARKANSAS FIRE PREVENTION CODE

2021 INTERNATIONAL MECHANICAL CODE

2009 INTERNATIONAL ENERGY CONSERVATION CODE

2018 ARKANSAS FUEL GAS CODE

2018 INTERNATIONAL FUEL GAS CODE

2020 NATIONAL ELECTRIC CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

Revision Required
No
New Planset Required For Module Swap
No

Stamps

Ee Stamp Required On SLD
No
Structural Calculations Required
No

Structural & loads

Reducible Snow Load Allowed
Yes

Electrical

AC Disconnect Required
No
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Town of Coy (AR) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.