City of Apache Junction (AZ)
NEC Code Version2017
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1
Codes
- NEC Code Version
- 2017
- Fire Code Version
- 2018 Building Code
- Code List
2018 INTERNATIONAL BUILDING CODE 2018 INTERNATIONAL RESIDENTIAL CODE 2018 INTERNATIONAL EXISTING BUILDING CODE 2018 INTERNATIONAL FUEL GAS CODE 2018 INTERNATIONAL ENERGY CONSERVATION CODE 2018 INTERNATIONAL SWIMMING POOL AND SPA CODE 2018 UNIFORM MECHANICAL CODE 2018 UNIFORM PLUMBING CODE 2017 NATIONAL ELECTRICAL CODE 2018 INTERNATIONAL FIRE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 2
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
- Leave two 36-inch-wide walkways on different sides of the roof from bottom to top.
- If panels cover more than 33% of the roof, keep a 36-inch gap on both sides of the ridge.
Structural & loads
- Wind Speed
- 100
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,PV Breaker,Meter Adapter,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.87
Battery / ESS
- Unique Battery Placards Needed
- 1
- ESS Notes
AVOID INTERIOR BATTERY INSTALLATIONS PER CORRECTIONS ON 550259
- AHJ: City of Apache Junction. Utility Co: SRP - Salt River Project Power and Water. Install all equipment, including battery, on same wall as MSP. [a past project. DCR 100820]
- Maintain at least 5 feet of space between the outdoor battery enclosure and any property (lot) line.
- Keep the battery at least 10 feet away from any building exit (means of egress) to allow safe exit in an emergency.
- Keep the battery at least 10 feet away from any bedroom window to reduce risk to occupants.
- Provide a clear, unobstructed path at least 10 feet wide from the battery location to the backyard gate or other exit route.
- Separate ESS Disconnect Required
- Local Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
OK to use XR10 rail SLD & TLD NONE
PCS not allowed after discussion with a past project Powers, 1/8/2025.
- Electrical Diagram
- Clearly label if the main panel is top-fed, center-fed, or bottom-fed.
- Do not use the term “end-fed.”
- Custom Placards Required
- 0
- Non Standard Planset Requirements
- N/A
Ground mount
- Ground Mount Fencing Required
- No
- Ground Mount Notes
- No GM Fence needed
- Add the distance from the septic tank to the proposed Array.
- A minimum of 10' is required
- Setback Front Yard
- 20
- Setback Back Yard
- 5
- Setback Side Yard
- 5