City of Bisbee (AZ)

Arizona Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2014
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2014
Fire Code Version
2018 Building Code
Code List

2012 INTERNATIONAL RESIDENTIAL CODE 2012 INTERNATIONAL PLUMBING CODE 2012 INTERNATIONAL BUILDING CODE 2012 INTERNATIONAL EXISTING BUILDING CODE 2012 INTERNATIONAL PROPERTY MAINTENANCE CODE 2014 NATIONAL ELECTRIC CODE 2012 INTERNATIONAL FIRE CODE 2012 INTERNATIONAL FUEL GAS CODE 2012 INTERNATIONAL MECHANICAL CODE 2012 INTERNATIONAL ENERGY CONSERVATION CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

Revision Required
0
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
85
Snow Load
20
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

Standard

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,Load Side Taps,Line Side Taps,PV Breaker
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Roof Plan

Provide pictures of the street view of the house and around the house.

Provide an image of the proposed install layout. A snip from aurora will work for this. See example image in files section

Ground mount

Ground Mount Fencing Required
Mesh/Scrim