City of Prescott (AZ)

Arizona Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2017
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced1

Codes

NEC Code Version
2017
Fire Code Version
2018 Building Code
Code List

2018 INTERNATIONAL BUILDING CODE

2018 INTERNATIONAL RESIDENTIAL CODE

2018 INTERNATIONAL ENERGY CONSERVATION CODE

2018 INTERNATIONAL EXISTING BUILDING CODE

2018 INTERNATIONAL FUEL GAS CODE

2018 INTERNATIONAL MECHANICAL CODE

2018 INTERNATIONAL PLUMBING CODE

2017 NATIONAL ELECTRICAL CODE

2018 ICC A117.1 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES 2018 INTERNATIONAL GREEN CONSTRUCTION CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
2
Revision Required
0
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes - 10kW+
Wet Stamps Required
Digital Structural,Digital Electrical
Structural Calculations Required
Yes
Ee Stamp Notes

Over 10kw requires EE MPU 400A or higher requires EE

Stamp Location On Plans
Top Right
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
115
Wind Notes

Exposure Category B

Snow Load
30
Snow Load Notes

Snow load is non-reducible

Reducible Snow Load Allowed
0
Max Attachment Spacing
48
Structural Notes

Must have engineer clarification of sistering requirements MAKE SURE PLANS ARE UNLOCKED WHEN SUBMITTED FOR PERMITS

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Line Side Taps,Meter Adapter,Load Side Taps,PV Breaker
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
1

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

Flood Zone Compliance

Per AHJ correction for elevation cert - The H/O either has to provide proof of Flood insurance/certificate that the community is FEMA Compliant 

Or we will need to acquire proof of the elevation, via 3rd party PE, which would show that the home is at an elevation for which water would not attain. Please reach out to HO and confirm if they have already access to such documentation, if Not we can try to see if the PE will stamp of stamp from ASCE tool elevation data (unsure on adders here, may need to higher surveyor to provide concrete proof of the home's elevation).

Electrical Diagram

Panel schedule required for load relocation. Provide separate schedule for each panel.

Label Page

* Please check "Prescott Label Page Example" uploaded in file section; They require all labels to be in color including the Map Placard Page. See Above ^^ * Labels to specify Reflective, in color (See sample on Electrical sample image in Electrical Sample), location of the Placard, and they also added a new label for the Main breaker. * PLANS MUST HAVE THE "RAPID SHUTDOW SWITCH FOR SOLAR PV SYSTEM" AND A MAP LEGEND SHOWING LOCATION/PLACEMENT OF REQUIRED LABLES. DERATES: * “This Breaker has been down-sized. Replacement breaker is not to exceed XXXX Amp Rating.”

Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
Yes
Ground Mount Notes

Setback requirements may vary by lot. Call Planning and Zoning to verify . Ground Screws allowed. GM max height: 20' Freeze/Thaw Depth: 18'


for septic maps, contact: Yavapai County-

Ground Mount Requires Soil Sample
Soil Study
Setback Front Yard
30
Setback Back Yard
12
Setback Side Yard
30
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Prescott (AZ) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.