County of Mohave (AZ)
Codes
- NEC Code Version
- 2017
- Fire Code Version
- 2018 Building Code
- Code List
2018 International Residential Code
2018 International Building Code
2018 International Mechanical Code
2018 International Plumbing Code
2018 International Fire Code
2018 International Fuel Gas Code
2018 International Existing Code
2018 International Property Maintenance Code
2017 National Electrical Code
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 2
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- None
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
At CR stage, create a related ticket to permitting: "Please request the PFI form and Plot Plans"
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category C Seismic Zone C
- Snow Load
- 0
- Snow Load Notes
Please include note on Plans
0' UP TO 3,000โ 5PSF FROM ABOVE 3,000โ TO 4,500โ 10PSF FROM ABOVE 4,500โ TO 5,400โ
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- All Jobs
- Allowed POI
- Meter Adapter,PV Breaker,Line Side Taps,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Service Ground Requirements
Expose or install 2 ground rods a minimum of 6โ apart and driven 8โ deep with continuous bond. Per NEC 2017 250.53G, 250.53A2&3
- Temperature Rating
- 90
- De Rating Ampacity
- 0.87
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Please RED cloud & Delta sign any changes made to the plans and provide the revision letter for the changes made.
- Cover Page
Mohave expects the flood PFI form. Email them to request a PFI form "" Mohave is the only county that wants that form
- Site
**The AHJ is expecting to see Measurements from all structures, electrical Equipment, septic tanks and wells to all four property lines.
Mirror the measurements to provided plot plans, if plot plans are not present in files. Request via permit coordinator \/ \/
* Request current plot plans at " **" or** "" - they require the street to show at the bottom of the plans * Please see attachment 'Structural Site Plan' to the files of what the AHJ requires on the site plans. * Request Site plans from the AHJ to use on plans. Septic tank needs to be shown on plans with the setback from the home and property lines * Accessory structures on the site must be labeled with dimensions and distances to property lines
- Site Notes
All Jobs [PRODUCTION METER AND AC DISCONNECT SHALL BE WITHIN 10 FEET OF MAIN PANEL AND UTILITY METER TO COMPLY WITH SERVICE REQUIREMENTS]
- Electrical Diagram
Centerfed 120% allowed
3 and Single line diagram required.
- Electrical Diagram Notes
All Jobs [Expose or install 2 ground rods a minimum of 6โ apart and driven 8โ deep with continuous bond. Per NEC 2017 250.53G, 250.53A2&3]
AHJ Requires a single line diagram as well as a 3 line diagram in the plan set.
- Custom Placards Required
- 1
- Placards Notes
The labels must be plastic or metal and cannot be stickers
AHJ Placard requirements are in the files section
- Non Standard Planset Requirements
- Single Line Diagram
Ground mount
- Ground Mount Fencing Required
- No