Town of Prescott Valley (AZ)
Codes
- NEC Code Version
- 2017
- Fire Code Version
- 2018 Building Code
- Code List
2018 INTERNATIONAL BUILDING CODE 2018 INTERNATIONAL RESIDENTIAL CODE 2018 INTERNATIONAL PLUMBING CODE 2018 INTERNATIONAL MECHANICAL CODE 2018 INTERNATIONAL FUEL GAS CODE 2018 INTERNATIONAL FIRE CODE 2008 INTERNATIONAL ENERGY CODE 2017 NATIONAL ELECTRIC CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching,MPU,Derate
- How Many Plansets Required
- 2
- Revision Required
- 0
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes - 12kW+
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Ee Stamp Notes
EE Stamp Required over 12 kW.
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category C
- Snow Load
- 30
- Snow Load Notes
Roof & ground snow load 30lbs (NON-REDUCIBLE)
if autostamping need to update this on calcs as well
- Reducible Snow Load Allowed
- 0
- Max Attachment Spacing
- 48
- Structural Notes
Please make sure calcs reflect the following Roof snow load (non-reducible) 30 PSF 115 mph wind speed, Exposure ‘C’ SE digital stamps on corresponding PV pages & PE Letter / Calcs. WS: 115mph. Exposure C. SL: 30lbs EE Stamp Required over 12 kW.
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Conditional Criteria
- Wire size from DER storage disco to DER storage must be 8-AWG. Util PM to be labeled “SG-type Bi-Directional Production Meter” Backup Loads Sub-Panel Meter to be labeled “Blue Face Mono-Directional Production Meter”
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,PV Breaker,Meter Adapter,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Wire size from DER storage disco to DER storage must be 8-AWG. Util PM to be labeled “SG-type Bi-Directional Production Meter” Backup Loads Sub-Panel Meter to be labeled “Blue Face Mono-Directional Production Meter”
- Separate ESS Disconnect Required
- Gateway Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Provide a 6-inch-high x 6-inch-wide clear space on the cover sheet for jurisdiction approval stamps. Provide a 3-inch-high x 3-inch wide on each additional page of each pdf in the lower right quadrant for jurisdiction stamps.
- Cover Page
Provide a 6-inch-high x 6-inch-wide clear space on the cover sheet for jurisdiction approval stamps. Provide a 3-inch-high x 3-inch wide on each additional page of each pdf in the lower right quadrant for jurisdiction stamps.
- Cover Page Notes
All Jobs [WIND EXPOSURE "C" // SEISMIC "C" // WIND SPEED "C" 115 MPH // 30 PSF SNOW LOAD] Roof Mount [Building type of construction: VB]
- Electrical Diagram
Show voltage drop calculation for all DC and AC circuitries
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- No
- Ground Mount Notes
10' side yard if located in first half of property, drops to 3' on back half of property. JH - 07/23/2020
- Setback Front Yard
- 10
- Setback Back Yard
- 10
- Setback Side Yard
- 3