Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Berkeley (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

IEBC Accepted
1
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Date SolarAPP+ Accepted
45182
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Existing Systems,Trenching,MPU,Derate
How Many Plansets Required
Other (See Submission Notes)
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category B

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes
  • Panels are allowed to be mounted a maximum of 10 inches or less above the roof surface or a licensed engineer is required to provide structural design calculations and details for wind uplift and all connections. [CBC 3111.1.1]
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,Load Side Taps,Line Side Taps,PV Breaker
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
1

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes
  • ESS on the exterior side of exterior walls shall be located not less than 3 feet from doors and windows directly entering the dwelling unit. [CRC R328.4(3)]
  • Provide manufacturer’s installation and mounting specifications
  • Include mounting detail of ESS on Elevation page
  • Where energy storage device input or output terminals, or the circuits from these terminals pass through a wall, floor or ceiling, a readily accessible disconnecting means and overcurrent device shall be provided within sight of the energy storage component. Fused disconnecting means or circuit breakers shall be permitted to be used. [CEC 706.15 (A)(1)(2)&(D)]
  • The disconnecting means shall be legibly marked in the field. The marking shall meet the requirements of CEC 110.21(B) and shall include the following:
  • [CEC 706.15(C)] “ENERGY STORAGE SYSTEM DISCONNECT, Nominal ESS AC Voltage, Maximum ESS DC Voltage”
Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
Yes

Plan set

Plan Set Requirements


Cover Page
  • Indicate the existing and proposed Occupancy Group classification(s). [CBC 302.1]
  • Indicate each structure’s occupancy type (single family, multifamily, commercial or accessory structure, etc.).
  • Provide the number of units, and the number of stories.
Roof Plan
  • Provide specifications for the existing roof framing member size, spacing and span.
  • If the existing roof rafter spacing exceeds the maximum allowable under current code, provide plans and construction details for the reinforcement of the roof framing or provide calculations produced by a licensed design professional showing that the existing framing is adequate to support the applicable design loads. [CRC R802.5]
Attachment Detail
  • The sample roof framing plan must be adjusted to match the layout on the roof.
  • Include distance from roof to top of module on plans.
  • Panels to be maximum of 10 inches above the roof surface
Electrical Diagram


Label Page
  • Battery jobs required the following label on the disconnect: “ENERGY STORAGE SYSTEM DISCONNECT Nominal ESS AC voltage ___ and maximum ESS DC voltage___”
  • Provide an ESS disconnect label with the information listed above
Custom Placards Required
1

Ground mount

Ground Mount Fencing Required
No
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Berkeley (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.