NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Existing Systems,Trenching,MPU,Derate
How Many Plansets Required
2
Revision Required
1
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
None
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

If there is a fence, at least one fire pathway must be accessible outside the fence. Pathways must be over supported roof structure meaning setbacks start at a load bearing wall

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category B

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

Standard

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
PV Breaker,Load Side Taps,Meter Adapter,Line Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96
BOS Restrictions

Standard

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes
  • ESS disconnect required within 6ft of ESS on same wall and not blocked by walls/gates/etc
Separate ESS Disconnect Required
Local Disconnect,ESS Disconnect
ESS Elevation Detail Required
Yes - with dimensions

Plan set

Plan Set Requirements

Each sheet of the plans is to be signed by the person preparing the plans. Electronic signatures are acceptable. Please provide required signatures of the person responsible for the construction documents

Cover Page

Provide complete Project Site Information (occupancy group, type of construction, fire sprinklers, APN, # of stories, etc.)

Cover Page Notes

All Jobs [PV system disconnecting means shall be provided in accordance with the 2025 California Electrical Code (CEC) , NFPA 70 690.13 // A rapid shutdown switch shall be provided at a readily accessible location outside the building in accordance with the 2025 California Electrical Code (CEC). NFPA 70. 690.12©️ // All labeling shall comply with section 324 of the 2024 International Residential Code and Articles 690 and 705 of the 2025 California Electrical Code (CEC) , NFPA 70 // All labeling shall comply with CEC 110.21 (B) // A label shall be installed not greater than 3ft. from the electric utility service location that includes the location of all identified Rapid Shutdown switches if not at the same location. IRC 324 // The labels shall indicate which type of Rapid Shutdown system is installed, and include a simple diagram with sections in red designating areas that are not controlled by the rapid shutdown switch. CEC 690.56(C)(1) // Buildings with more than one rapid shutdown type: A detailed plan view diagram showing each PV system and a dotted line around areas that remain energized after the rapid shutdown switch is operated. NEC 690.56(C)(2) // Rapid Shutdown (PV Hazard Control) Switch: This switch shall have a label not greater than 3 ft. from the switch that states the following: Rapid Shutdown Switch for Solar PV System NEC 690.56(C) (3) // A roof access point should be provided that does not place a ground ladder over an opening such as a window or door. Located at a solid point in the building construction and in the locations where the access point does not conflict with overhead obstructions such as limbs, wires, or signs. // Carbon Monoxide and Smoke detectors shall be provided in accordance with the code. 2024 IRC R314, R315 // Rooftop-mounted PV system shall have the same fire classification as the roof assembly required in 2024 IRC R902.4, R324.4.2 // Building-integrated photovoltaic products installed as the roof covering shall be tested, listed and labeled for fire classification. 2024 IRC R902.3, R324.5.2 // Building-integrated photovoltaic products installed as the roof covering shall comply with the minimum requirements for the fire classification “Class A”. 2021 IRC R902.1 // PV panels and modules shall be listed and labeled to UL 1703 and/or both UL 61730-1 and UL 61730- 2 NEC 690.4(B) IRC R324.3.1 // Inverters shall be listed and labeled to UL 1741 NEC 690.4(B) IRC R324.3.1 // Hazard control system shall be listed and labeled to UL 3741 NEC 90.7; 110.3(C); 690.12(D)]

Site Notes

Battery [ESS units will be separated from each other by at least 3 feet or documentation will be provided showing that the batteries have been tested in accordance with UL9540 and a fire involving one ESS will not propagate to an adjacent ESS // ESS units shall be at least 3 feet from doors and windows.]

Roof Plan
  • Provide the locations and spacing of the PV supports on the roof plan.
  • Add roof access point leader to each fire setback
Roof Plan Notes

Roof Mount [Roof access point at the front of the residence must not be blocked off by gate/fence] 

Electrical Diagram

120% rule allowed per CEC 705.12(B)(2)(3)(d)

Custom Placards Required
1

Ground mount

Ground Mount Fencing Required
No