City of Brentwood (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Date SolarAPP+ Accepted
- 45198
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching,MPU
- How Many Plansets Required
- 3
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- None
- Structural Calculations Required
- Yes - Tile Roof
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
- STRUCTURAL ONLY REQUIRED FOR TILE ROOFS. SE digital stamps on corresponding PV pages &PE letter /Calcs.
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates,All Jobs
- Allowed POI
- PV Breaker,Meter Adapter,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
9540A accepted - manufacturer required spacing between batteries is allowed.
ESS disco preferred to be adjacent to MSP
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
IF DESIGNING WITH TAPS (Recommend avoiding load side taps in this AHJ):
Manufacturer approval of tap in the service panel
Manufacturer approval of conductor tap *
Provide Load calcs for service panel and ampacity
Fill calculations for service panel If no main breaker is present and the source circuit exceeds the 120 of the main bus rating, load calculations are required - 03/11/2021 (HB) - Per the [Corona, Alfonso DCR]
- Site
- Roof Plan
Clearly indicate on project plans whether or not the home has an automatic sprinkler system.
Existing Systems: Include the existing array in the percentage of roof coverage calculation.
- Roof Plan Notes
SPRINKLERS: (YES/NO)
MODIFIED SETBACKS: (YES/NO)
TOTAL ROOF AREA: XXX SQ FT
TOTAL ARRAY AREA: XXX SQ FT
ARRAY COVERAGE: XX%
- Electrical Diagram
- Hot bus requires load calcs
- Taps Manufacturer approval of tap in the service panel
- Manufacturer approval of conductor tap
- Provide Load calculations for service panel and ampacity
- Identify conductors between main and subpanel if necessary
- Custom Placards Required
- 1
- Placards Notes
Placards are required - permanent placards from placard page of plans
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim