City of Chico (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusTesting
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Testing
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
3
Revision Required
0
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
None
Structural Calculations Required
No
Ee Stamp Notes
Stamp Needed for Main Breaker Derate
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
105
Wind Notes

Exposure Category C

Snow Load
0
Snow Load Notes

N/A

Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes
On top of a residence, no. For a ground-based system or on a newly built structure over parking, yes.
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
PV Breaker,Line Side Taps,Load Side Taps,Meter Adapter
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91
BOS Restrictions

Standard

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

9540A accepted - manufacturer required spacing between batteries is allowed.


Include this note on ELD - [Producer's storage device(s) will not cause the Host Load to exceed its normal peak demand. Normal peak demand is defined as the highest amount of power required from the Distribution System by Producer's complete facilities without the influence or use of the energy storage device(s)]


Provide "ENERGY STORAGE DISCONNECT" Plaque on each ESS system disconnect per CEC 706.15 (C).


Provide Mounting details for Battery.


Provide an elevation of the wall showing the battery locations including distances from any doors or windows


Batteries shall not be installed under a window


Batteries shall be at least 3' horizontally from any door or window 


Provide a clearly labeled disconnect device for the batteries on the exterior wall of the residence. a breaker cannot be used for the required disconnect if possible, locate the disconnect near the msp.


The disconnect shall be located a minimum of 5 ft from the batteries 


Interior ESS installations:

  • Provide overhead view of garage to show impact / non-impact areas and where the ESS will be located.
  • Provide note: HEAT ALARM WILL BE INTERCONNECTED TO THE SMOKE ALARMS IN THE HOME AND INSTALLED PER MANUFACTURER'S INSTRUCTIONS.
Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
Yes

Plan set

Plan Set Requirements

Racking spec sheets must include the UL Listing

Electrical Diagram

no fault studies/load calcs required single line diagram required


MPU - Provide surge protection on new main panel per California Electrical Code (CEC) 230.67.


EXISTING SOLAR MUST BE REFLECTED THROUGH OUT PLANS AND ELECTRICAL CALCS IF PRESENT ONSITE

Custom Placards Required
1
Placards Notes

We only need placards if inverter is not in line of site of main service panel

Non Standard Planset Requirements
Single Line Diagram

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Ground Mount Notes

03/09/21 SJ - Must fill out ESPC worksheet for GM's per a past project correction. Uploaded to file section below.