City of Compton (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Testing
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 3
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- None
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,Line Side Taps,Meter Adapter,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 1
- BOS Restrictions
Standard
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
[LACOF]
This AHJ follows County of Los Angeles (ESS Requirements) (CA).
Please follow this link to County of Los Angeles (ESS Requirements) (CA)
ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Plan Set Requirements
ANY UNPERMITTED STRUCTURES ARE FOUND, NEED TO BE LABELED AND THIS NOTE HAS TO BE ADDED ON SITE PLAN [Non permitted structure to be removed or legalized under a separate permit, prior to inspections no electrical loads are allowed to non-permitted structures]
- Site
SITE PLAN MUST BE IN 1/8:12 SCALE
Indicate whether the structure we are installing on is permitted and/or if it has electrical. This includes all sheds, patio covers, etc.
- Site Notes
All Jobs [Non-permitted structures will be removed or legalized under separate permit // No electrical loads are allowed on non-permitted structures-uses, power will be disconnected prior to final approval]
All Jobs [All exposed conduits, wiring, mounting hardware, etc, must be painted to match the color of the roof/ facade respectively. Conduit between structures must be underground.]
- Roof Plan
- Roof Plan Notes
All jobs [Prior to Install panels, track and mounting connecting hardware]
- Electrical Diagram
- Label Page
Placard must address of install. Include compass orientation to North on placard
- Custom Placards Required
- 1
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim