City of Concord (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Date SolarAPP+ Accepted
- 45187
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching
- How Many Plansets Required
- 3
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Center
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
If the roof has a slope greater than 2/12 provide a 36-inch wide pathway from the lowest edge to the roof to the ridge on the roof plane with the array per CRC R324.6.1, else get fire district approval for non-conformance.
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Snow Load Notes
N/A
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Non Solar App Standard Submissions require structural calcs.
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- All Jobs
- Allowed POI
- Load Side Taps,PV Breaker,Meter Adapter,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
- If battery system, include this note on ELD: Producer's storage device(s) will not cause the Host Load to exceed its normal peak demand. Normal peak demand is defined as the highest amount of power required from the Distribution System by Producer's complete facilities without the influence or use of the energy storage device(s).
- Back up ESS that require a separate plan set with no mention of PV
- NOTE - AHJ WILL NOT ACCEPT ESS SPACING UNDER 3' EVEN WITH 9540A AND FIRE INSPECTOR APPROVAL
- The Contra Costa Fire Department requires all UL 9540 test reports be the "full" report (typical report is 60 pages).
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
- If load calcs are required (e.g. hot bus, derate), include any sub-panels in the system. Load calcs are required for all solarapp permits.
- requires structural if utilizing tilt kit The roof has a slope greater than 2 and 12.
- Provide a 36-inch wide pathway from the lowest edge to the roof to the ridge on the roof plane with the array per CRC R324.6.1, else get fire district approval for non-conformance.
- FD requires a Full Report UL9540A
- Site Notes
Battery [ESS shall comply with CRC 328.4]
- Roof Plan
STANDARD
- Electrical Diagram
If load calcs are required (e.g. hot bus, derate), include any sub-panels in the system. Indicate the rating of all overcurrent protection devices connected to the main service panel. [CEC 230.71] Confirm the new PV breaker shall be rated as suitable for service equipment.
For MPU: indicate that the new main electrical panel shall have a Type 2 (load_x0002_side) surge-protective device (SPD). Alternatively, please specify a Type 1 (line side) SPD. [CEC 230.67]
- Custom Placards Required
- 1
- Placards Notes
Permanent placards from placard/label page of Approved plans
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim