City of Daly City (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Date SolarAPP+ Accepted
- 45205
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching,MPU
- How Many Plansets Required
- 2
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
- ESS Wall Calcs Necessary
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,PV Breaker,Load Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 1
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Provide the following working clearances: 36” in depth, 30” in width, and 6’-6” in height. Working clearances apply to all electrical equipment. Vegetation, including trees, which impact working clearances, shall be relocated (CEC110.26).
Systems shall only be installed in locations listed in CRC 328.4 (CRC R328.4) and comply to Table R328.5
Working clearances. This includes the Rapid Shutdown switch 110.26 Spaces About Electrical Equipment. Access and working space shall be provided and maintained about all electrical equipment to permit ready and safe operation and maintenance of such equipment.
(1) Depth of working space. The depth of the working space in the direction of live parts shall not be less than that specified in table 110.26(A)(1) unless the requirements of 110.26(A)(1)(a), (A)(1)(b), or (A)(1)(c) are met.
Distances shall be measured from the live parts or from the enclosure or opening if the live parts are enclosed.
Please show min 3ft working clearance from the face of the equipment measured to the property line.
Plan Reviewer to check plot plan to ensure all working clearances are code compliant. For most residential applications a minimum of 3 feet is required.
ESS STRUCTURAL:
S.8 If the ESS is wall-mounted and its weight is 200 lbs. (or more), you must provide structural details in the drawings and calculations as a separate document (CBC 1603.1.8).
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
For all projects 10kW or less, The Standard Checklist, Standard Plan and Structural Checklist () must be filled out and signed by the designer regardless if we qualify or not. If a checkbox is marked NO complete it still, this information was given to me directly from the plan checker. USE RMC OR PROVIDE CORROSION PROTECTION We can use both EMT or RMC - when using EMT it must be galvanized steel or aluminum and we must provide corrosion protection for the conduit. If the tilt kits longest leg is longer than 17 across member must be added. Include property line setbacks. Make sure all font sizes are 10 or higher. Per staff, the plan checker, he says per the Energy Code all MPUs should be 200 amps or higher. If we are not upgrading to a 200A service we must provide residential load calcs, bus bar load calcs and I recommend we include the spec sheet for the MSP we are using. All print and numbering up to a minimum 10 font print size as required. The side setback where the main electrical service and AC Disconnect will be located needs a minimum of 3' clearance is required. The signage page must have: ALL CAPITAL LETTERS -MINIMUM 3/8 IN SIZE -REFLECTIVE SURFACE WITH THE MATERIAL SUITABLE FOR EXTERIOR USE Generate response letter for AHJ comments Please complete the Expedited PV Packet attached below. If omitted, permit issuance takes 2-3 weeks. When addressing AHJ corrections (DCR), provide CORRECTIONS RESPONSE LETTER Include property line setbacks. Make sure all font sizes are 10 or higher. Per staff, the plan checker, he says per the Energy Code all MPUs should be 200 amps or higher. If we are not upgrading to a 200A service we must provide residential load calcs, bus bar load calcs and I recommend we include the spec sheet for the MSP we are using All print and numbering up to a minimum 10 font print size as required The side setback where the main electrical service and AC Disconnect will be located needs a minimum of 3' clearance is required. The signage page must have: ALL CAPITAL LETTERS MINIMUM 3/8 IN SIZE REFLECTIVE SURFACE WITH THE MATERIAL SUITABLE FOR EXTERIOR USE
- Cover Page Notes
All Jobs [Contractor to provide a written list of torque specifications on site for the inspection of each piece of electrical equipment related to the system, including circuit breakers, equipment grounds, neutrals, and feeders. Contractor to torque all connections per the manufacturer’s listings prior to the CPA inspection. The inspector will witness a spot check. If all terminations are found to be tight, no further torquing will be required. If loose connections are found, all connections will be required to be torqued in front of the CPA inspector. The electrical contractor must be on site with the following tools. (CEC 100.3(B)) Torque wrench Torque screwdriver (with a range of up to 50 lb-in.) and be audible type (ratcheting) Channel locks to secure lugs in place when applying the proper torque]
- Site
Scale needs to be 1/8" = 1' see example above under setback image
- Roof Plan
Signage or roof markings (e.g. yellow stripes) shall be provided delineating the area around the panel must be kept free of obstructions. Identify on roof plan.
- Attachment Detail
NOTE -- AHJ DOES NOT ALLOW BALLAST SYSTEMS IN AHJ
- Attachment Detail Notes
R324.4.3 Roof penetrations, have note on plans:
Roof penetrations shall be flashed and sealed in accordance with Chapter 9.
- Electrical Diagram Notes
EMT shall not be used where protected solely by enamel (CEC358.12)
- Label Page
MINIMUM 3/8" REFLECTIVE SURFACE WITH MATERIAL SUITABLE FOR EXTERIOR USE
- Custom Placards Required
- 1
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim