City of Grass Valley (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching
- How Many Plansets Required
- 2
- Revision Required
- 0
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- None
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category C
- Snow Load
- 999
- Snow Load Notes
4ft o.c spacing 40-70 lb snow load:\ 2ft o.c spacing over 70 lb snow load
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,PV Breaker,Load Side Taps,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Where circuits from an ESS pass through a wall or partition, a disconnect is required at the ESS per CEC 706.15 (D) that is lockable in the open position per CEC 110.25. Show the required disconnect on the single line. Note: the disconnect at the exterior per CEC 706.15(A) is still required.
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
we can submit structural engineering to supersede AHJ requirements below 0-40 lb snow load: 4ft o.c spacing 40-70 lb snow load: 2ft o.c spacing over 70 lb snow load: project shall be designed by CA licensed engineer wind exposure C Include span tables from the manufacturer of the attachment system
- Cover Page Notes
Battery [ESS installed in locations subject to vehicle damage shall be provided with impact protection in accordance with CRC R328.8]
- Electrical Diagram
Standard
- Custom Placards Required
- 1
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim