City of Huntington Park (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Testing
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 3
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- None
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,Load Side Taps,PV Breaker,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 1
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Plan Set Requirements
Modules specs must list UL 1703, 61730, or 1741.
- Cover Page
Provide on Cover Page: * Zoning information * Lot size * Aerial phot of site and label streets
- Cover Page Notes
All Jobs [A STRUCTURAL OBSERVATION LETTER FROM THE ARCHITECT OR ENGINEER WILL BE REQUIRED AT FINAL INSPECTION // NOTIFICATION OF SERVING UTILITY REQUIRED PRIOR TO ACTIVATION OF PV SYSTEM]
- Site
APN number required on site plan
- Roof Plan
California fire roof ladder access points need to be pointed out and specified on roof plan Show the existing roof type and sheathing, if applicable Show dimension of modules, BOS equipment, distance from modules to edge of roof in all directions.
- Roof Plan Notes
All Jobs [Mechanical and plumbing vents on the roof will not be covered with solar PV panels // The home does not contain an active fire sprinkler // A roof access point should be provided that does not place a ground ladder over an opening such as a window or door. Located at a solid point in the building construction and in the locations where the access point does not conflict with overhead obstructions such as tree limbs, wires, or signs. // The utility will be notified before activation of the PV system]
- Electrical Diagram
Show on ELD that there is proper arc fault protection of the PV system MPU requires Load Calcs
- Custom Placards Required
- 1
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim