City of Huntington Park (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusTesting
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Testing
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
3
Revision Required
0
New Planset Required For Module Swap
0

Stamps

Wet Stamps Required
None
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category B

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

Standard

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,Load Side Taps,PV Breaker,Line Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
1

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
Yes - with dimensions

Plan set

Plan Set Requirements

Modules specs must list UL 1703, 61730, or 1741.

Cover Page

Provide on Cover Page: * Zoning information * Lot size * Aerial phot of site and label streets

Cover Page Notes

All Jobs [A STRUCTURAL OBSERVATION LETTER FROM THE ARCHITECT OR ENGINEER WILL BE REQUIRED AT FINAL INSPECTION // NOTIFICATION OF SERVING UTILITY REQUIRED PRIOR TO ACTIVATION OF PV SYSTEM]

Site

APN number required on site plan

Roof Plan

California fire roof ladder access points need to be pointed out and specified on roof plan Show the existing roof type and sheathing, if applicable Show dimension of modules, BOS equipment, distance from modules to edge of roof in all directions.

Roof Plan Notes

All Jobs [Mechanical and plumbing vents on the roof will not be covered with solar PV panels // The home does not contain an active fire sprinkler // A roof access point should be provided that does not place a ground ladder over an opening such as a window or door. Located at a solid point in the building construction and in the locations where the access point does not conflict with overhead obstructions such as tree limbs, wires, or signs. // The utility will be notified before activation of the PV system]

Electrical Diagram

Show on ELD that there is proper arc fault protection of the PV system MPU requires Load Calcs

Custom Placards Required
1

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Huntington Park (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.