City of Indio (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Date SolarAPP+ Accepted
- 44995
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restriction Notes
- System must be less than 15kW
- No Ballasted Systems
- Must be on main dwelling rooftops of residential structures
- NOT in a special district, historic neighborhood, environmentally sensitive area, or hillside development zone
- SolarAPP+ Restrictions
- Existing Systems,Trenching,Historic District,Other
- How Many Plansets Required
- 2
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Electrical,Digital Structural
- Structural Calculations Required
- Yes
- Ee Stamp Notes
SITE PLAN AND ELD MUST HAVE ELETRICIAL STAMP ON THEM
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Roof Mount Projects
- Buildings must have at least two clear pathways, 36 inches wide, on separate roof planes from the lowest edge to the ridge.
- At least one pathway must be on the street-facing or driveway side of the roof.
If a solar array is installed on a roof, there must be a 36-inch-wide pathway either:
- On the same roof plane,
- On an adjacent roof plane, or
- Across both the same and adjacent roof planes.
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category C
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Structural Calcs Required: Wind Speed min 115, Exposure C
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- All Jobs
- Allowed POI
- PV Breaker,Load Side Taps,Line Side Taps,Meter Adapter
- Panel Schedule Required
- All Projects
- Temperature Rating
- 90
- De Rating Ampacity
- 0.87
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
- The ESS disconnect must be visible from the Main Service Panel (MSP), located on the same wall, and unobstructed by walls, gates, etc.
- UL9540A - AHJ allows reduced spacing, if using reduced battery spacing in project then UL9540A cutsheets must be added to end of planset, required by inspector.
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
- Cover Page
Existing systems
- Call out the existing system size, the proposed system size (our system), and the combined size of the two systems
Battery Projects
- Add a note specifying the total kW of the ESS being installed
- Cover Page Notes
All Jobs [A final fire inspection is required. The Applicant/Installer is responsible for contacting the Indio Fire Marshal’s office at to schedule an inspection. A minimum of 48-hour notice is required]
- Site
All Projects
- Add EXTERIOR or INTERIOR to battery callout leader
- Show the existing gas meter location
Battery In Garage Projects
- Show a detailed garage floor plan indicating the location of the Tesla ESS panels and spacing requirements (per CFC 1206.11.2.1 and 1206.11.3.2).
- Show protection details for the garage, such as bollards or parking blocks (per CFC 1206.11.7).
- Indicate the location of the Fire Detection Heat Detector (per CFC 1206.11.6
- Provide manufacturer spec sheets for heat detector.
- Site Notes
Battery [AC DISCONNECT TO INITIATE RAPID SHUTDOWN TO BOTH PV AND ESS WHEN PROMPTED]
- Roof Plan
- Roof Plan Notes
All Jobs [Provide adequate workspace per NEC code 110.26 30 inch minimum width, 3 feet maximum depth solar PV panels shall not obstruct or interfere with the function of plumbing vents or mechanical equipment]
- Attachment Detail
Provide UL listing for flat tile roof hooks or verification info that it is compatible with our racking.
- Electrical Diagram
When an inverter is located inside the garage, an AC disconnect shall be installed in the garage and outside the garage.
- Electrical Diagram Notes
Battery [AC DISCONNECT TO INITIATE RAPID SHUTDOWN TO BOTH PV AND ESS WHEN PROMPTED]
- Custom Placards Required
- 1
- Placards Notes
Permanent placards from placard page of plans
- Must have hard placards for inverter and AC disconnect - Will not accept stickers
- Non Standard Revision Requirements
Corrections and Revisions
- For every resubmittal, please resubmit the previous redline plan check comments.
- Resubmit the revised plans without the correction stamp.
Ground mount
- Ground Mount Fencing Required
- No