City of Irvine (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Derate
- How Many Plansets Required
- 1
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 1
Stamps
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Modules must be 4ft away from property line (condos, multifamily dwellings). Demonstrate 4ft setback from shared property lines on the roof.
Structural & loads
- Wind Speed
- 95
- Wind Notes
Exposure Category C
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
ESS projects will require structural calculations for the attachment of the battery to the wall
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates,Load Relocation
- Allowed POI
- Meter Adapter,PV Breaker,Line Side Taps,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Supply Tap Neutral Ground Bond Required
- 1
- Temperature Rating
- 90
- De Rating Ampacity
- 1
- BOS Restrictions
AC Disconnect to be readily accessible.
Battery / ESS
- Unique Battery Placards Needed
- 1
- ESS Notes
- Battery jobs require special placards. Provide ESS label for nominal AC voltage and maximum DC voltage per CEC 706.15 C.1
- When the Battery is located in the garage, the lockable ESS Disco must go inside garage. Include Heat Detector and spec sheets
- Dimension on single line the distance between battery and electrical equipment it is connected to. If battery is more than 5 feet from electrical panel/equipment, show disconnect on single line and provide disconnect specifications in plan set per Art. 706.7(E); otherwise, dimension on single line conductor length to be “less than 5 feet”
- Verify if ESS connection distance is more than 5 feet from electrical panel/equipment.
- Provide disconnect on single line and specification per Art. 706.7(E) if greater than 5 feet.
- Note distance on drawings.
- PLEASE PROVIDE MANUFACTURERS INSTRUCTIONS ON ATTACHMENTS TO STRUCTURE/SFD.
- Provide mounting detail sheet to plans for ESS batteries in plan set to be stamped by PE
ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc
provide load calcs for backup load panel/isolated loads panels
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
- Attach City of Irvine Photovoltaic General Notes in the back of the plan set.
- Provide spec sheet showing the module and racking/attachment system are approved to be installed together and meet a fire classification rating of A.
- Class A rating must be explicitly stated. This is commonly found in the install manual of the racking/attachment. Uploaded below: (SM_Installation_UL2703)
- EV charging: complete EVCS App Package in files below and upload with PV Plans
- Site Notes
Battery [ESS units installed outdoors or on the exterior side of exterior walls shall be located not less than 3 feet from doors and windows directly entering the dwelling unit.]
- Roof Plan
All jobs:
- Modules must be 4ft away from property line (condos, multifamily dwellings). Demonstrate 4ft setback from shared property lines on the roof.
Existing Solar:
- Array roof coverage calculations must include existing solar array
- Electrical Diagram
120% rule allowed per CEC 705.12(B)(2)(3)(d) If relocating loads to a sub panel, list the loads to be relocated
- Electrical Diagram Notes
All Jobs [CONDUCTORS MODIFIED OR EXTENDED OVER 6' SHALL COMPLY WITH ART 210.12(D) OF CEC FOR AFCI PROTECTION]
- Label Page
When derating the main breaker, include a label indicating "The main circuit breaker has been downsized to "_" amps, do not upsize it"
- Custom Placards Required
- 1
- Placards Notes
Permanent placards meeting CA placarding requirements + OFCA placarding requirements (for ESS Jobs)
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim