City of La Mirada (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Testing
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- Other (See Submission Notes)
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- None
- Structural Calculations Required
- Yes
- Ee Stamp Notes
- SCE Utility requires EE stamp on plans for line side tap POI.
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 95
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,PV Breaker,Meter Adapter,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 1
- BOS Restrictions
Standard
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
[LACOF]
This AHJ follows County of Los Angeles (ESS Requirements) (CA).
Please follow this link to County of Los Angeles (ESS Requirements) (CA)
ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Plan Set Requirements
- Conduit required to be inside the attic If attic is limited, AHJ wants to see pictures of limited attic or vaulted ceiling preventing attic run.
- jobs with limited attic space Please integrate 3 pictures of the inside of the home showing that there is a vaulted ceiling or the attic is too small
- Site
- For MPUs: Show the location of new and existing main service panels on the site plan to comply with Section 210.12(B)
- Show equipment elevation for the BOS
- Site Notes
All Jobs [All electrical work shall be designed per 2020 Los Angeles County Electrical Code, 2025 California Electrical Code, and 2023 National Electrical Code. // 110.2 Approval: All electrical equipment shall be labeled, listed, or certified by a Nationally Recognized Testing Laboratory accredited by the United States Occupational Safety Health Administration]
- Roof Plan
- Specify roofing material, number of layers, and slope(s) on roof plan.
- Conduit must be in the attic unless there is no attic or no workable space in the attic
- Electrical Diagram
- THE PV BREAKER SHALL BE LOCATED AT THE OPPOSITE END OF THE MAIN BREAKER OR INPUT FEEDER
- For systems with multiple strings, the plans shall clearly identify how all modules are mapped to each string and/or inverter input.
- Identify where relocated existing loads are being moved from. If relocated more than 6 ft., provide AFCI protection for 15- and 20-amp rated circuitsper Sect. 210.12(B).
- Remove "OR LARGER" from the conduit call-out on the electrical diagram
- Provide a detail for grounding and bonding. The detail should identify the interconnections of module - module, module - rail, rail - rail; the specific manufacturer and model of the grounding lug (UL2703 listed); the conductor size; and any other information that may be needed. See attached LA County Grounding & Bonding packet for reference.
- Optimizers are being used provide a detail showing how to bond them using a listed UL 2703 lay in lug OR the solar edge grounding lug with EGC passing through it.
- Racking systems: โUL 2703 listed racking systems recognized by L.A. County for integrated grounding and bonding can be found at http://dpw.lacounty.gov/bsd/content/publications.aspx?doc=Guide.pdf. The installation instructions for these systems can be downloaded from this page.โ
MPU ONLY:
- Are the service conductors fed via an overhead drop or an underground feed? If overhead, provide the size of the service entrance conductors.
- Cold water bond within 5 feet and at least 1 supplemental electrode are required . Art. 250.50, 250.53(0) 2 ground rods, 6' apart minimum.
- Identify the size of the grounding electrode conductor to all new electrodes that are part of the main service grounding electrode system. GEC shall be sized per Table 250.66
- Electrical Diagram Notes
- Non Standard Planset Requirements
- BOS Elevation
- Non Standard Revision Requirements
- Plans require revision letter and rev cloud on all changes
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim