City of Lodi (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Date SolarAPP+ Accepted
45130
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Existing Systems,Trenching,MPU
How Many Plansets Required
3
Revision Required
1
New Planset Required For Module Swap
0

Stamps

Structural Calculations Required
No

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category C

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes
10/22/19 LL - Sending a past project as a test to see if structural is required.
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Line Side Taps,PV Breaker,Meter Adapter,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91
BOS Restrictions

Standard

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

Plans are required to specify and show existing roof framing (i.e. 2 x 4 engineered trusses @ 24oc, 2 x 6 DF#2 rafters @ 16oc w/14¸4span) and roofing material. Residential roof with engineered trusses are not required to have additional engineering. Conventionally framed roofs will have the rafter spans verified against 2013 CRC, Table R802.5.1 (1). Projects with existing over-spanned rafters will require a separate building permit for the structural reinforcement of the existing roof structure to support the additional loads from the photovoltaic system. Plans, detail and structural design calculations shall be prepared by an Architect or Professional Engineer, licensed in the State of California. Include fire setback dimensions

Site

MPUs * Site plan should show OLD MSP location, OLD MSP amperage, NEW MPU amperage, and NEW MPU Location. (See _MPU Site Plan Example_ in files section)

Attachment Detail

Plans are required to specify and show existing roof framing (i.e. 2 x 4 engineered trusses @ 24”oc, 2 x 6 DF#2 rafters @ 16”oc w/14’ 4” span) and roofing material. Residential roof with engineered trusses are not required to have additional engineering. Conventionally framed roofs will have the rafter spans verified against 2013 CRC, Table R802.5.1 (1). Projects with existing over-spanned rafters will require a separate building permit for the structural reinforcement of the existing roof structure to support the additional loads from the photovoltaic system. Plans, detail and structural design calculations shall be prepared by an Architect or Professional Engineer, licensed in the State of California.

Electrical Diagram

PV generation meter required If Lodi Electric utility, INVERTER > DISCO > PROD METER MPU: Plans should show current panel location and proposed location of new panel (even if same) Plans should show current panel amperage and proposed amperage of new panel The 120% rule is allowed when the utility main breaker and the PV breaker are at the opposite ends of the busbar, per 2016 CEC, Article 705.12 (D)(2)(b). Center fed panels cannot exceed 100% of the busbar rating unless engineer design calculations with fault studies and busbar load calculations are provided per 2016 CEC, Article 705.12 (D)(2)(d). Engineering stamp not required

Label Page

Attach Lodi Labelling PDF

Ground mount

Ground Mount Fencing Required
No
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Lodi (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.