City of Mission Viejo (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Existing Systems,Trenching,Trenching,MPU,Derate,Derate
- How Many Plansets Required
- 3
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
A pathway not less than 36 inches wide shall be provided from the lowest roof edge to ridge.
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category C
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates,Load Relocation
- Allowed POI
- Meter Adapter,Load Side Taps,PV Breaker,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc
Need a disconnect local to battery as well.
When mounting battery in garage, show heat detector on elevation page.
Also note that ESS/Inverter is locked or requires a tool to open (For Tesla Powerwall 3)
- Separate ESS Disconnect Required
- ESS Disconnect,Local Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Plan Set Requirements
Add 11x17 Unirac UL2703 certification uploaded below to plan-set.
- Site
Disconnect to be placed within 3' of main panel, and line of sight with inverter. 2nd disco may be necessary to satisfy this requirement.
- Roof Plan
- Electrical Diagram
All jobs [any circuit relocated more than 6ft must be on an AFCI breaker.]
All Jobs
Load Calcs required for ALL JOBS
Provide datasheet if lug kit (if applicable)
Sub Panel
Include a panel schedule showing the location of each breaker, and which panel it will be in after the relocation (not applicable for whole home backup projects)
Bus Certs must be signed and sealed by the engineer who provided it
- Electrical Diagram Notes
All Jobs [MAIN SERVICE PANEL MAY NOT BE USED AS A JUNCTION BOX OR RACEWAY // Any circuits relocated more than 2 ft in a common conduit may be subject to deration // Any circuits relocated more than 6 ft must be AFCI protected. // AC disconnect must have a lock or require a tool to open]
- Label Page
DERATE
Include label indicating that main breaker has been derated and shall not be upsized
- Custom Placards Required
- 1
- Non Standard Revision Requirements
Provide correction narrative letter detailing how each correction was resolved,
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim