City of Monterey (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Existing Systems,Trenching
How Many Plansets Required
3
Revision Required
1
New Planset Required For Module Swap
0

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category B

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Line Side Taps,PV Breaker,Load Side Taps,Meter Adapter
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
1

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

Provide following notes for photovoltaic panels.

  • Photovoltaic circuits shall not be located in the same raceway, junction box, outlet box, etc. as non-photovoltaic circuits. CEC 690.4B
  • Photovoltaic systems with DC circuits shall have arc-fault protection (when greater than 80 volts) and GFCI protection. CEC 690.11
  • The photovoltaic main disconnecting breaker shall be located at the opposite end of the bus bar from the main disconnecting circuit breaker. CEC 705.12D
  • A disconnecting means shall be provided for all photovoltaic equipment. If the equipment is energized from more than one source, the disconnecting means shall be grouped and identified. CEC 690.15
  • When the photovoltaic inverters are connected on the load side of the main disconnect (after the main breaker), the sum of the photovoltaic disconnects shall not exceed 20% of the main electrical panel rating. CEC 690.64
  • Provided a 3"x3" blank space above or near the sheet number for the city approval stamp at same location of each page
  • Amend title sheet to include the following information:

Occupancy Classification

Specify Construction Type

Existing Building SQFT:

Solar Panels Installation SQFT:

Fire Sprinklers Within Residence?: (YES or NO)

Number of stories:(1, 2 or 3)

Attachment Detail

Please provide a cross-section of the new roof structure. Please clarify if the existing roofing material will be removed and new roof insulation installed Identify weight of existing roofing and weight of new roof assembly, anchorage and roof penetrations.

Electrical Diagram

Existing shall be interpreted as not being affected by the work within the scope of this permit

Electrical Diagram Notes

Contractor is responsible to arrange for inspection of electrical equipment, including conductor terminations in panels, in a de-energized condition.


Custom Placards Required
1

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Monterey (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.