City of Moreno Valley (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Date SolarAPP+ Accepted
45145
Any SolarAPP+ Restrictions
1
SolarAPP+ Restriction Notes
derates allows, MPU will be a seperate permit
SolarAPP+ Restrictions
Existing Systems,Trenching
How Many Plansets Required
2
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes - 10kW+
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Not less than 18 inches straddling clearance shall be clearly shown for each roof plane with PV arrays.

Additionally, a 36 inch roof access shall be shown from the lowest roof edge to the ridge line on each roof plane with a PV array.

Solar panels shall maintain a distance from the edge of the roof not less than 2 times the height that the modules are installed above the roofs surface

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category C

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

Standard

Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
Yes
Electrical Load Calcs Required
Derates
Allowed POI
Load Side Taps,PV Breaker,Meter Adapter,Line Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
75
De Rating Ampacity
0.96

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Where solar batteries are installed within dwelling units, or attached garages, the ESS shall be protected by a smoke detector.

Where smoke detectors are not permitted to be installed, there shall be a listed heat detector installed. CRC R327.7

Please provide a listed heat detector for the ESS being installed in the garage where the battery will be installed.

Do not place ESS units in attached garages unless a sprinkler system is already installed and connected to the smoke alarm system.

No current alternatives are allowed. Indicate an additional disconnecting means when the ESS is not within sight of the connected equipment and or not in sight of Utility meter

Battery spec sheets must demonstrate compliance with UL9540 Multiple ESS Units:

Provide manufacturer specs that call out the separation distance required between ESS units.

When ESS is not in line of sight of MSP ESS disconnect required within line of sight of Battery on same wall and not blocked by walls/gates/etc

An additional disconnecting means shall be adjacent to the ESS, when not within sight of the connected equipment."

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
Yes - with dimensions

Plan set

Plan Set Requirements

EV CHARGERS:

  • Complete the EV charger checklist from the files below
  • Provide an EV charger plan set with site plan, manufacturer specs, and electrical load calcs
Site

If relocating MSP, indicate original location as well as proposed location of new MSP.


Make sure chimney does not obstruct fire access pathways

Roof Plan

ALL JOBS:

  • Provide proposed location of conduit run * CONDUIT SHALL RUN ALONG THE BOTTOM OF LOAD BEARING MEMBERS. * Conduits to be located as close as possible to an outside wall to reduce trip hazards.
  • Conduits between arrays shall be installed to minimize the amount of conduit on the roof.
  • Avoid placing the conduit run through a fire setback/fire access pathway (unless it is specified that the conduit is being run internally)
  • Patio covers cannot be included when calculation area of roof coverage.

EXISTING SYSTEMS:

  • Include roof array coverage calculations for existing and new PV combined
Roof Plan Notes

All Jobs [Conduit shall not be located above the roof within a Fire Access Pathway]

Attachment Detail


Electrical Diagram
  • Busbar Certs not accepted in this AHJ.
  • If relocating loads, need to indicate which loads are being relocated on plans. Panel schedule required
  • Centerfed 120% allowed
  • For MPUs: indicate the rating of the existing MSP on plans. New panel shall be rated 225A or higher Surge protector required for MPU. Call out SPD on plans.
  • For Derates: Include a photo of the panel to verify load calcs.
Label Page

Existing Systems:

Site placard to show new and existing solar panels

Custom Placards Required
1

Ground mount

Ground Mount Fencing Required
Situational
Ground Mount Notes

Standard If GM is in front of house, it DOES require fencing. No specific material required, but they do prefer decorative. Max height is 6'. Setbacks are same as residential. See online.

Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Moreno Valley (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.