City of Norwalk (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching
- How Many Plansets Required
- 3
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- None
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
5' fire setbacks are required on the rake, accounting for overhang. 18 at the ridge is accepted if array coverage is below 33% Pathways must be over supported roof structure meaning setbacks start at a load bearing wall
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Snow Load Notes
N/A
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
SE/EE digital stamps on corresponding PV pages & PE Letter / Calcs. WS: 95mph. Exposure B. When adding to an existing system, the PE calcs must call out the roof being able to support both new and existing loads.
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,PV Breaker,Meter Adapter,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 1
- BOS Restrictions
Standard
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
[LACOF]
This AHJ follows County of Los Angeles (ESS Requirements) (CA).
Please follow this link to County of Los Angeles (ESS Requirements) (CA)
ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc
UL9540A is NOT recognized by this AHJ
[ESS Unit shall be installed and maintained a minimum of: // 3โ from another ESS unit, a structure corner, an intersecting wall, any door, window, operable opening into the building or HVAC inlet // 5โ from a lot lint, public way, another building, stored combustible material, hazardous material // 10โ from vegetation (PER LACFC, SECTION 1207.5.7).]
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Plan Set Requirements
Show the required working clearances around the Service meter main, AC Disconnect, Inverters, and DC disconnects 3' minimum.
Property lines have to be at least 3 ' away form the roof.
Shade unpermitted structures for plan checker (planning dept. request). This allows them to see that solar is not being placed on unpermitted structure. ADD NOTE: demolish or legalize separately on unpermitted structure
Remove pages PV 8,9,10 from Permit planset (create install planset with all pages)
- Cover Page Notes
All Jobs [All PV equipment shall be listed by a recognized tested lab // Smoke and CO detectors are required]
- Site
Property lines need to match assessor parcel map & must include parcel map
Show the required working clearances around the Service meter main, AC Disconnect, Inverters, and DC disconnects 3' minimum.
Property lines have to be at least 3 ' away from the roof.
Show setbacks from modules/equipment to the property line
- Roof Plan
AHJ requires rail, attachments & rafters to be shown on roof plan.
Show conduit run on roof plan
Call out distance from edge of roof to front of solar panel 5โ min clearance
- Roof Plan Notes
All Jobs [Do not cover mechanical and plumbing vents on the roof with solar PV panels. // Modules installed on dwellings shall not be placed on the portion of a roof that is below a bedroom window. 36 inch wide pathway shall be provided for window opening.]
- Attachment Detail
Specify the spacing of the module attachment method to mounting structure Framing plan to match solar arrays
- Electrical Diagram
Wire sizes on Single line Diagram must be one up on the ground. If 10 AWG /8 EGC gauge needed
- Electrical Diagram Notes
All Jobs [Inverter is equipped with arc fault protection // When a backfed breaker is the method of utility interconnection, breaker shall not read Line and Load. CEC 690-10 (E)]
- Label Page
Provide full address on placard
Provide a warning label at the utility-interactive inverter or ground fault indicator stating "WARNING: ELECTRICAL SHOCK HAZARD. IF A GROUND FAULT IS INDICATED, NORMALLY GROUNDED CONDUCTORS MAY BE UNGROUNDED AND ENERGIZED."
If a switch or circuit breaker has all the terminals energized when in the open position, a label should be placed near it indicating: CEC 690.13(B). WARNING: ELECTRIC SHOCK HAZARD - TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION.
The main service disconnect will be labeled "SOLAR DISCONNECT"
- Custom Placards Required
- 1
- Placards Notes
All placards listed on the plans, must include the "PV DC DISCONNECT" placard with the current and voltage ratings. Must also include inverter current and output placard.
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim