Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Pleasanton (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Existing Systems,Trenching
How Many Plansets Required
3
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Wet Stamps Required
None
Structural Calculations Required
Yes - Battery
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category B

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes
**Structural Calcs:** According to PV Submittal requirements below, as long as we do not exceed 5lbs/sf we do not have to provide calcs. Run an IronRidge report (testing with Chen, Zigang) and attach with plans to prove that we are under. **Battery projects:** PE signature/seal required on PE calcs and mounting details
Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
Yes
Electrical Load Calcs Required
Derates
Allowed POI
Load Side Taps,PV Breaker,Meter Adapter,Line Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Currently the UL9540A for reduced spacing is not accepted. Must provide 3 feet separation between ESS units.


Provide ESS mounting hardware sheets. Details shall illustrate the minimum embedment into framing members, and the number of fasteners to be used.


For ESS inside of garage:

  • Draw heat detector above ESS and include note: HEAT DETECTOR WILL BE HARD WIRED AND INTERCONNECTED WITH SMOKE DETECTORS INSIDE THE HOUSE.
  • Provide Heat Detector specification sheet.


Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
Yes

Plan set

Plan Set Requirements

The PV plan pages must contain Greg's signature or be signed by the designer.

For ESS projects a note must be added to elevation diagram stating that ESS will be installed 3ft or more from any window or door leading into the dwelling.

Placard to state MULTIPLE SOURCES OF POWER

Cover Page

* Indicate scope of work on the cover sheet specifying the PV system size, number of modules and panel upgrade/sub panel addition as applicable.

Site Notes

For ESS projects a note must be added stating that ESS will be installed 3ft or more from any window or door leading into the dwelling.

Electrical Diagram

Standard

Label Page


Custom Placards Required
1

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Pleasanton (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.