City of Sacramento (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restriction Notes
  • No ballasted systems 


SolarAPP+ Restrictions
Existing Systems,Trenching,Other
How Many Plansets Required
3
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category C

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

AHJ does not want to see the blue "signature panel" after the plans are signed

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,PV Breaker,Line Side Taps,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
75
De Rating Ampacity
0.96

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

AHJ accepts UL 9540A

  • Battery units can be spaced per manufacturer requirements
  • ESS shall not be located 3' from openings to dwelling areas of the building
Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements
  • Inverter callout on TLD must indicate S|1, datasheet must be included that corresponds
  • If the proposed inverter cannot indicate S|1, then include note - SOLAR INVERTER IS SMART INVERTER COMPLIANT PER CALIFORNIA RULE 21
  • If installing EV charger, AHJ requires EV Charger only plans and PV Plans that also show the EV Charger.
Cover Page

EV CHARGER:

This AHJ requires EV Charger solo plans and Solar Plans that also show the EV Charger.

Cover Page Notes

MPU [NEW ___A / ___A SERVICE PANEL TO BE INSTALLED]

  • Fill in the blanks with correct info per project
Site
  • The PV disconnect must be within 10' of the meter
  • Call out the location of the gas meter


Site Notes

All Jobs [ALL NEW ELECTRICAL EQUIPMENT SHALL BE PLACED NO CLOSER THAN 3' FROM THE GAS RISER]

Battery [ESS SHALL NOT BE LOCATED LESS THAN 3' FROM OPENINGS TO THE BUILDING]

Rooftop transition of NM cables where it enters that attic shall be enclosed and protected in the attic and not under the eaves. CEC 320.23(A) 

Roof Plan Notes

Battery [ESS SHALL NOT BE LOCATED LESS THAN 3' FROM OPENINGS TO THE BUILDING]

Electrical Diagram

EV CHARGER:

  • Show the conductor size and type to the EV CHARGER
  • Show the Overcurrent device size and type on the plans for the EV charger

This AHJ requires EV Charger solo plans and Solar Plans that also show the EV Charger.


Clarify PV system disconnecting means shall be rated for available fault current at terminals. Identify PV disconnect AIC/AIR rating and verify it equals or exceeds available fault current at point of connection. (CBC 1603.1; CEC 110.9, 110.10, 690.13(D))


Clarify how PV system grounding electrode conductor (GEC) will connect to existing building grounding electrode system. Identify: PV GEC size, existing grounding electrode conductor size, bonding jumper size at point of connection, and bonding/termination method. (CEC Table 250.102(C)(1); CEC Table 250.66; CEC 690.45; CEC 690.47)


 Provide maximum PV string voltage (Vmax) calculation applying CEC Table 690.7(A) for project location and verify Vmax does not exceed equipment DC input rating. (CEC 690.7; Table 690.7(A))

Electrical Diagram Notes

All Jobs [The installation equipment and all associated wiring and interconnections shall be performed only by qualified persons” per 690.4 (C) of the CEC.]

Battery [ESS SHALL NOT BE LOCATED LESS THAN 3' FROM OPENINGS TO THE BUILDING]

Label Page

A label reading “CAUTION: MULTIPLE SOURCES OF POWER” is now required on the service placard

Custom Placards Required
1
Non Standard Revision Requirements

Spec sheet for junction box with NEMA rating.

Ground mount

Ground Mount Fencing Required
No
Ground Mount Notes
  • GM/SS not allowed in front yard (can call AHJ to confirm what is determined front yard
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Sacramento (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.