City of San Bernardino (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 2
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes - 10kW+,Yes - Battery
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Rooftop AC Units: 30" CLEARANCE REQUIRED AROUND
Structural & loads
- Wind Speed
- 130
- Wind Notes
Exposure Category C
- Snow Load
- 5
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Battery projects will require SE calcs from the engineer stating that the equipment being mounted to can support the weight of the batteries.
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Load Side Taps,Line Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
- BOS Restrictions
A disconnecting means is required within sight of the MSP
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
- ESS Units shall be located 3ft from any doors or windows.
- ESS Equipment's disconnecting means shall be readily accessible. The disconnecting means shall be located within sight of the ESS
- Battery disconnect needs to be within 10" of battery not MSP
- When drawing Solaredge Backup Interface, remove the RSD block on the ELD (or you will need to draw this on the site plan and site placard as well)
WHEN ESS IS LOCATED IN GARAGE
- Listed Heat Detector is required to be included in the plan set, corresponding data sheet required
- Elevation drawing showing battery is 3' above floor to avoid the installation of an impact protector is required if battery in inside garage
- verify chint breaker size is correct (63a) for SE7600 and 10000 energy bank inverters
- Separate ESS Disconnect Required
- Local Disconnect,ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Plan Set Requirements
H-Frame
Include elevation detail showing H-Frame details, proposed equipment locations, depth / footing detail
- Site
- Site Notes
Battery [ESS EQUIPMENT SHALL BE LOCATED 3' FROM ALL DOORS AND WINDOWS DIRECTLY ENTERING THE DWELLING UNIT. CRC R328.4 MULTIPLE ESS SYSTEMS SHALL BE SEPARATED FROM EACH OTHER BY AT LEAST 3'.]
- Roof Plan Notes
All Jobs [PV arrays shall be located at least (2 times the maximum height of the modules above roof deck) from the roof edge, a gable ridge or a hip ridge]
- Electrical Diagram
SUB PANEL
- Specify the distance between the existing main panel and the new subpanel (using a dimension line on the ELD).
- If this distance is greater than 6' Provide note on TLD: [EXISTING LOADS BEING RELOCATED TO SUB-PANEL LOCATED GREATER THAN 6 FEET AWAY, ALL LOADS WILL THEREFORE BE AFCI PROTECTED]
- Electrical Diagram Notes
Existing Systems [ALL PV SOURCES SHALL BE COMBINED INTO A SINGLE DEDICATED OVERCURRENT PROTECTION DEVICE]
All Jobs [AC disconnect required within 10' of Inverter]
- Label Page
DERATE
MUST INCLUDE LABEL INDICATING THAT BREAKER HAS BEEN DOWNSIZED AND SHALL NOT BE UPSIZED. ON THE LABEL, INDICATE THE AMPS THAT THE BREAKER HAS BEEN DERATED TO
- Custom Placards Required
- 0
- Non Standard Revision Requirements
DO NOT use abbreviations such as 'BOS' etc. on the narrative letter
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim
- Ground Mount Notes
Attached is the standards for cell sites. Being ground mounted there will also be requirements from fire and also building and safety. The project would require a Conditional Use Permit if it is a new system. Attached is the Planning Entitlement application. The items you would need for the entitlement are listed on the last page highlighted. 10' from other structures per Elizabeth - AHJ plan checker Scrim fencing is allowed instead of full fencing
- Setback Back Yard
- 3
- Setback Side Yard
- 3