City of San Diego (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 2
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes - 10kW+,Yes - Derate
- Wet Stamps Required
- None
- Structural Calculations Required
- Yes - Pitch > 24
- Ee Stamp Notes
- Busbar certification accepted
- EV CHARGERS REQUIRE STAMPED LOAD CALCS
- PE Requirements for stamping; Digital stamps with verifiable digital signature showing date stamped/signed and seal must show expiration date too. Stamp all applicable PV pages.
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Provide 2 roof access points on the roof plan preferably in the front of the house.
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category C
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Structural Calcs: Required if roof pitch is over 24 degrees. Tilt kits require structural.
If structural engineer review is applicable; All sheets of construction plans and the first sheet of calculations must be signed by a registered civil engineer or a licensed architect certified by the State of California. The civil engineer must stamp the above and note date signed; architects must note the license number and renewal date.
PE Requirements for stamping; Digital stamps with verifiable digital signature showing date stamped/signed and seal must show expiration date too. Stamp all applicable PV pages.
See file below "Digital Signature example" The AHJ wants to see our stamps look similar to this.
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates,Load Relocation
- Allowed POI
- PV Breaker,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 75
- De Rating Ampacity
- 1
- BOS Restrictions
Standard
Battery / ESS
- Unique Battery Placards Needed
- 1
- ESS Notes
- Per Rework Ticket #1859830 the AHJ does not require disconnects to be within 6 feet of MSP.
- Battery system needs Battery Disco.
- Battery system must be shown on placard.
- Label for Energy Storage System (NEC 706.7 (D)) - (SEE FILE SECTION)
- Separate ESS Disconnect Required
- Local Disconnect,ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
- Provide datasheet showing module and racking UL2703 grounding compatibility and class A fire rating. Highlight the applicable PV mod on the document.
- Site specific placard must show the site address
- Cover Page
Include staff's license classification (C-10 electrical, C-46 solar) in the title block
APN: (OBTAINED FROM ParcelQuest)
LEGAL DESCRIPTION: (MAP #, LOT #) (OBTAINED FROM ParcelQuest)
LAND USE TYPE: (OBTAINED FROM ParcelQuest)
ZONE NAME: (OBTAINED FROM Scoutred)
SCOPE OF WORK: Photovoltaic system comprised of __ modules, __kW, with ____ [Manufacturer] ESS, ___kW [charge rate], ___kWh [Capacity]
OCCUPANCY TYPE: List the type of residential building being installed on [R3 for residential home, R2 for multi-unit homes like duplexes, U for misc. like detached structures]
Plans should be numbered, not titled, as PV - ## (no decimals)
- Cover Page Notes
- Site
- Equipment needs to be a minimum of 4 feet from the property line.
- Provide a dimension from the property line to the Main Service Panel on the Site Plan.
- Roof Plan
ALL JOBS:
- SHOW CALCULATION JUSTIFYING THAT THE RIDGE SETBACK CAN BE REDUCED TO 18"
- PITCHED ROOFS, ADD NOTE [PV MODULES DO NOT EXTEND PAST HIGHEST ROOF PEAK]
- AVOID PLACING MODULES ON FLAT ROOF IF AT ALL POSSIBLE
- If the building(s) supporting the PV array has an existing grounding electrode, show the NEW OR EXISTING grounding electrode on the site plan and the line diagram (Per 690.47(A).)
FLAT ROOFS:
- PROVIDE WHOLE HOME ELEVATION DRAWING
- List the height of parapet walls on flat roofs (if any) in the plans. If array taller than the parapet wall, additional structural calculations required.
- Attachment Detail
- IDENTITY THE FLASHING AND THE ROOF DECKING IN THE STRUCTURAL ATTACHMENT DETAIL PAGE.
- UNIRAC ATTACHMENTS SHALL BE RENAMED 'UNIRAC SOLARMOUNT (DO NOT CALL OUT LIGHT RAIL)
- Indicate modules are flush mounted on flat roofs if we are using chem curb no tilt
- Electrical Diagram
ALL JOBS:
- REMOVE VERBIAGE "OR #X AWG MUST BE IN EMT CONDUIT" from Mods to J-box
- AC disconnect to be located within sight and within 10ft of the inverter
- POI can't be in a subpanel located in a closet
- Existing EV chargers MUST be on SLD.
- If the building(s) supporting the PV array has an existing grounding electrode, show the NEW OR EXISTING grounding electrode on the site plan and the line diagram (Per 690.47(A).)
SUB-PANEL:
- Load calcs required for sub panels if we are relocating loads. Load calcs shall indicate which loads being relocated.
- The load calculation page in the plans must match the formatting of the other PV pages with the title block and page size.
- Electrical Diagram Notes
All jobs [AC DISCONNECT TO INITIATE RAPID SHUTDOWN WHEN PROMPTED // PV system is using an integrated grounding UL2703 "continuous grounding using # 6"]
- Label Page
ALL JOBS:
- Make sure placards are red and rapid shutdown placard is yellow, refer to labels page
BATTERY:
- INCLUDE BATTERY DISCONNECTING MEANS PLACARD WITH RELEVANT VALUES
- Custom Placards Required
- 1
- Non Standard Planset Requirements
- Home Elevation
- Non Standard Revision Requirements
For all revisions/corrections
Changes made to the plans must be clouded and labeled as Deltas, and the title page needs to have a full description of what the changes/revisions are.
In the title page we must also state the pages in which the changes/revisions are located at.
Ground mount
- Ground Mount Fencing Required
- No
- Ground Mount Notes
Include assessor's parcel number on plans
Plan requirements:
- clearly indicate & dimension all setbacks
- indicate property dimensions
- Specify the pipe column and beam specifications and thickness on the plans.
- Specify the concrete specifications on the plans ie, compressive strength, water to cementitious materials ratio, cement type, slump, maximum size aggregate, etc.
Setbacks are zoning specific, please use https://scoutred.com/zoning/93 to check your setbacks
Arrays built with pitch of a hill: Cannot be over 25 degrees.
- Setback Back Yard
- 20