Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Date SolarAPP+ Accepted
- 44798
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching
- How Many Plansets Required
- 3
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- None
- Structural Calculations Required
- No
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
- 04/21/21 - Submit completed "San Pablo Structural Criteria Form". See Files section of this page. 03/18/2021 (HB) - Marking this as Sometimes since it was needed for the flat roof on "a past project - 1811 Pablo Vista." (These 2x10 rafters were spaced at 55", which is non-standard.) For now, avoid getting stamped plans if the structure is more typical than for the project noted here.
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,PV Breaker,Meter Adapter,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 1
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
AHJ Requires 2 forms to be filled out, include them when uploading plans:
Photovoltaic - Structural Criteria_202104212132297174.pdf
Photovoltaic Expedited Permit_202104212131402951.pdf
if we are using a tilt-up kit, do not use the PZSE letter if it has the Clearance: 2 to 10 clear from top of roof to top of PV panel language or if it says FLUSH anywhere on it as the AHJ will see this as contradictory. Instead, use the [Unirac SM Low Profile Tilt State Letter 12-18-2020_CA_Stamped_Cert] in the files below. Submit completed San Pablo Structural Criteria Form. See Files section of this page.
- Electrical Diagram
120% rule allowed per CEC 705.12(B)(2)(3)(d)
- Custom Placards Required
- 1
Ground mount
- Ground Mount Fencing Required
- Yes
- Ground Mount Notes
Array must be 3' from Back and Rear Property Lines. 6' from the Main home. 12' Max height Septic Documentation will be gathered from Public Works (not applicable for most homes)
- Setback Front Yard
- 15