City of Tustin (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Date SolarAPP+ Accepted
- 45182
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching,Historic District
- How Many Plansets Required
- 1
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Ee Stamp Notes
- SCE Utility requires EE stamp on plans for line side tap POI.
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
SE digital stamps on all PV pages & PE Letter / Calcs. 1. Provide calculation by a licensed civil/structural engineer or architect to verify supporting members are adequate for existing and proposed loads. Alternate: Calculation is not required if arrays are supported at a maximum spacing of 4ft each direction and the maximum cantilever distance of panels is 18". 2. Provide lateral calculations by a licensed professional engineer or architect showing that affected existing lateral resisting elements are no more than 10% over stressed according to the 2022 CBC. Alternate: Lateral analysis is not required if total area of arrays is less than 250 sq ft over a second story roof or 350 sq ft over a first story roof.
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,PV Breaker,Load Side Taps,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 1
- BOS Restrictions
Need an AC disconnect within 3' of the MSP
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Cover Page Notes
All Jobs [Contractor shall be present to assist city inspector on job site during inspection and fall protection shall be provided upon request by the city inspector, as needed. // City of Tustin will not be held responsible for roof damage that may result from accessing the roof for the inspection of the PV system. // The equipment and system and all associated wiring and interconnections shall be installed only by qualified persons.]
- Roof Plan Notes
All Jobs [Conduit will be painted to match the exterior of the home // Solar panels shall be placed no more than 4-6 inches from the roof exterior. // All equipment requiring servicing shall meet the required clearances. // If UFER cannot be confirmed, then ground rods 6 feet apart and 8 feet minimum into the ground must be installed with continuous bond.]
- Attachment Detail
INCLUDE DIMENSION SHOWING MAX HEIGHT OF TOP OF MODULE TO ROOF PLANE 6 MAX
- Electrical Diagram
120% rule has to be stated on plans and load calcs must be included.
- Electrical Diagram Notes
All Jobs [The GEC shall be continuous. // DC ground-fault protection shall be per 690.41 // The sum of the ampere ratings of the over current devices in circuits supplying power to a bus bar or conductor shall not exceed the rating of the bus bar or conductor.]
- Label Page
Provide permanent signage at all AC disconnects: "PHOTOVOLTAIC ARRAY AC DISCONNECTS"
- Custom Placards Required
- 1
- Non Standard Revision Requirements
If the permit team has not submitted to the AHJ yet, do not include a revision letter with the plans. The AHJ finds it confusing.
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim