City of Visalia (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Date SolarAPP+ Accepted
- 45194
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching
- How Many Plansets Required
- Other (See Submission Notes)
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- None
- Structural Calculations Required
- No
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
- Structural needed if we are installing on patio cover
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates,Load Relocation
- Allowed POI
- Meter Adapter,PV Breaker,Load Side Taps,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
- BOS Restrictions
Standard
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
- Single POI in main panel.
- PV system must have dedicated breaker in gateway.
- Battery isolating disconnect required.
- A disconnecting means shall be provided for all ungrounded conductors derived from an ESS and shall be permitted to be integral to listed ESS equipment.
- ESS - Must maintain 3' spacing between batteries.
The disconnecting means shall comply with all of the following:
- The disconnecting means shall be readily accessible.
- The disconnecting means shall be located within sight of the ESS. Where it is impractical to install the disconnecting means within sight of the ESS, the disconnect shall be installed as close as practicable, and the location of the disconnecting means shall be field marked on or immediately adjacent to the ESS. The marking shall be of sufficient durability to withstand the environment involved and shall not be handwritten.
- The disconnecting means shall be lockable open in accordance with 110.25.
- For one-family and two-family dwellings, a disconnecting means or its remote control shall be located at a readily accessible location outside the building.
- If using lug feed to gateway provide photo of label showing lug kit # or spec sheet for MPU.
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Site
Provide 3' clearance around HVAC for maintenance.
- Site Notes
Battery [Battery mounted outdoors or on the exterior side of exterior walls located not less than 3 feet (914 mm) from doors and windows directly entering the dwelling unit.]
- Electrical Diagram
- Show the size of OCPDs in sub-panel(s) and MSP.
- Show that the sum of the ampere rating of all OCPDs on panels, both load and supply, excluding the rating of the main breaker protecting the MSP busbar does not exceed the ampacity of the busbar. CEC 705.12(B)((2)(c).
- If combining systems, only one PV breaker allowed.
- Bus certification REQUIRED if there is no panel sticker.
Per the AHJ building official they enforce the following types of tie ins:
- Sum of all breakers
- 120% rule (Breaker tie into the main)
- Line side tap IF the panel is listed. Otherwise, we do a GMA with SCE's approval of max 60a's.
- Two or more power sources must be on one single breaker at MSP. Per CEC 705.12(A) Each source interconnection of one or more power sources installed in one system shall be made at a dedicated circuit breaker or fusible disconnecting means.
- Per AHJ if MSP label is missing, provide a letter from a California Electrical Engineer indicating the maximum breaker that can be installed in the branch circuit. (BUS CERTS)
- Electrical Diagram Notes
PV Breaker [PV breaker shall be installed at the opposite end or as far as possible from the main breaker]
- Label Page
- To the distribution equipment, attach a permanent label with this wording: WARNING: THIS EQUIPMENT FED BY MULTIPLE SOURCES. TOTAL RATING OF ALL OVERCURRENT DEVICES EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE SHALL NOT EXCEED AMPACITY OF BUSBAR.
- If you're doing a DERATE provide a placard stating Main Breaker Has Been Derated: Do Not Upgrade Breaker.
- Custom Placards Required
- 1
- Placards Notes
- Permanent placards from placard sheet of plans
- SPECIAL PLACARD - AHJ REQUIRES PCS SETTING FOR ALL TESLA POWERWALL JOBS
Special Solar Edge ESS Placard for SE ESS
- LIST BATTERY TYPE & SPECS
- Non Standard Revision Requirements
When revising plans, every change must be red clouded on all affected pages and the resubmission letter needs to list all updated pages in the plans.
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim
- Setback Back Yard
- 5
- Setback Side Yard
- 5