County of Nevada (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 2
- Revision Required
- 0
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- None
- Structural Calculations Required
- Yes - Attachment Spacing > 2ft
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category C
- Snow Load
- 999
- Snow Load Notes
Check county GIS for project specific snow load.
Find specific parcel and click on "parcel report" snow load will be displayed on the bottom table titled "property context" varies per site location 0-70+ psf snow load
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 24
- Structural Notes
- Engineering not required IF the attachment spacing is 24" on center. If attachments are spaced greater than 24" on center, follow below PE requirements. PE Requirements; SE digital stamps on corresponding PV pages & PE Letter / Calcs. WS 110 MPH
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,PV Breaker,Meter Adapter,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
- All Tesla Powerwall jobs require a Gen Panel and disconnect between Gen Panel and Gateway.
- ESS projects must have an ESS disconnect within 3' of the main panel.
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
On the location of the AC disconnect, it should be between the batteries and the new 125amp load center. This is due to the fact that the batteries would still continue to feed the critical loads if the current disconnect on the single line diagram is used. 48 OC attachments for the entire county.
- Site
ESS projects must have an ESS disconnect within 3' of the main panel.
- Electrical Diagram
Standard
- Electrical Diagram Notes
Battery [Producer's storage device(s) will not cause the Host Load to exceed its normal peak demand. Normal peak demand is defined as the highest amount of power required from the Distribution System by Producer's complete facilities without the influence or use of the energy storage device(s).]
- Custom Placards Required
- 1
Ground mount
- Ground Mount Fencing Required
- No
- Ground Mount Notes
- Accurately show the location of the well (if necessary) on the site plans
- Accurately show the location of the septic system on site plan
records request for septic and plot maps = Community Development Public Records Request | Nevada County, CA
- Setback Front Yard
- 20
- Setback Side Yard
- 15