County of Santa Barbara (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Date SolarAPP+ Accepted
45188
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Existing Systems,Trenching
How Many Plansets Required
3
Revision Required
1
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
None
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category B

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

Standard

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
PV Breaker,Load Side Taps,Meter Adapter,Line Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

WHEN MOUNTING BATTERY(S) IN INTERIOR OF GARAGE - Provide floor plan including all (E) doors and (E) lighting. Provide note: Smoke detector to be installed above all interferon mounted ESS equipment. ELD: Please show where WEG Soft Start is to be installed (attach spec sheets).


Include this note, Producer's storage device(s) will not cause the Host Load to exceed its normal peak demand. Normal peak demand is defined as the highest amount of power required from the Distribution System by Producer's complete facilities without the influence or use of the energy storage device(s).


ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
Yes - with dimensions

Plan set

Plan Set Requirements

For Batteries & Any time we are installing a subpanel / relocating loads in general: Please note All relocated loads to comply with CEC210.12D. AFCI protection Please note that 25A back feed breaker on new sub panel to have additional hold down hardware CEC408.36D Ground Mounts - See attached guidelines in Files.

Electrical Diagram

AHJ accepts 120% on center-fed mains with alternate means and methods. No EE stamp required.

Custom Placards Required
1
Placards Notes

Permanent placards from placard page of plans

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Ground Mount Notes

VEGETATION AROUND ARRAY SHALL BE CLEARED VERTICAL: 13'-6" HORIZONTAL: 10' may need scrim fencing under GMs to protect conductors (sending a past project to test)