County of Shasta (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Testing
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 2
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 95
- Wind Notes
Exposure Category C
- Snow Load
- 999
- Snow Load Notes
Check the County's GIS map for roof snow load ---> LINK
(Enable snow load theme by clicking on layer list in the top right hand corner and then go to Resource Management (Planning, Building) and check that box, and in that dropdown, check the Roof snow load box.)
Please include ground snow load for ground mount projects
Roof Snow Load from GIS Map to Ground Snow Load to show on Plans:
- RSL: 30 PSF / GSL: 43 PSF
- RSL: 35 PSF / GSL: 50 PSF
- RSL: 40 PSF / GSL: 57 PSF
- RSL: 50 PSF / GSL: 70 PSF
- RSL: 60 PSF / GSL: 86 PSF
- RSL: 70 PSF / GSL: 100 PSF
- RSL: 75 PSF / GSL: 107 PSF
- RSL: 80 PSF / GSL: 114 PSF
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 48
- Structural Notes
STRUCTURAL CALCS SHALL REFERENCE CBC
- REFERENCE SNOW LOAD SHEET (IN FILES) WHEN STAMPING STRUCTURAL
- Plans and calculations must indicate the amount and size of screw to be used in attachment
- If the roof mounts attachment more than 4' o.c., the truss manufacture's approval required. If attachment spacing is greater than 4 ft, wet stamps are required
- Include calculations for "applied uplift force" used in the withdrawal calculations.
- Include calculations for the deflection checks. Provide justification for the deflection limits for the roof framing.
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,PV Breaker,Line Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
- PV Summary Sheet (Fillable).pdf to be provided to permitting as a deliverable
- For Plot Plan criteria (roof mount and GM) check the attached files for AHJ requirements
NON-REFLECTIVE MODULES REQUIRED
If we cannot source non-reflective modules, then we must perform a glare analysis proving that the modules will not interfere with the local airport
Please reach out to REM for the login to the website for the anti-glare report. The homes within 10 miles of the airport should include this report, unless the spec sheet specifies the module is anti-glare
Provide data sheet for any existing generators on site
Provide data sheet for maximum span length and uplift for attachments/rail
2/10/24 provide cut sheet of subpanels if we are doing a subpanel tie in
AHJ requires PV Checklist Data Summary form
Photos of existing service panel
- Site
INCLUDE NOTE [MODULES ARE NON-REFLECTIVE]
MUST INCLUDE DATASHEET CORRESPONDING TO THIS
- Site Notes
All Jobs [ALL EQUIPMENT AND CONNECTIONS TO BE 1' ABOVE BASE FLOOD ELEVATION 3124.1' MINIMUM. ALL CONDUIT BELLOW TO BE WET PROOF. // ALL EXPOSED EMT CONDUIT SHALL UTILIZE WEATHER SEAL-TIGHT COMPRESSION FITTINGS // MODULES ARE NON-REFLECTIVE]
- Roof Plan
THE LAYOUT OF EXISTING PV SYSTEMS NEED TO BE ILLUSTRATED AS INDIVIDUAL MODULES, NOT ONE BIG 'OBSTRUCTION'
- Layout of modules needs to be replicated in Aurora before downloading DXF
- Roof Plan Notes
All Jobs [ALL EQUIPMENT AND CONNECTIONS TO BE 1' ABOVE BASE FLOOD ELEVATION 3124.1' MINIMUM. ALL CONDUIT BELLOW TO BE WET PROOF. // ALL EXPOSED EMT CONDUIT SHALL UTILIZE WEATHER SEAL-TIGHT COMPRESSION FITTINGS]
- Attachment Detail
Use 4' Attachment Spacing
Plans must indicate the amount and size of screw to be used in attachment
- Electrical Diagram
Existing Systems
- Need to show info on existing equipment, including conductor type and size.
- Electrical Diagram Notes
All Jobs [EXPOSED EMT CONDUIT SHALL UTILIZE WEATHER SEAL-TIGHT COMPRESSION FITTINGS]
- Label Page
a) Please include a sign with the exact wording. “ENERGY STORAGE SYSTEM DISCONNECT.” The sign must include the Nominal AC Voltage and Maximum DC voltage of the ESS system. CFC 1207.4.8
b) Please include a label on the ESS containing the contact information for the qualified maintenance and service providers. CFC 1207.1.6.1
- Custom Placards Required
- 0
- Non Standard Revision Requirements
- PV Summary Sheet (Fillable).pdf to be provided to permitting as a deliverable on every single revision
Ground mount
- Ground Mount Fencing Required
- No
- Ground Mount Notes
4/5/24 AHJ does not permit Nuance racking, please ensure designs are built with Ironridge
All projects must include ground snow load
- For acquiring septic plans, just call the AHJ ) and give them your email *
- All GM's require plot plan. Location of septic, septic replacement area and well required for plot plan. Please see plot plan under files.
- See Shasta county GM submittal info below for requirements
- Include filled out GM Checklist when uploading plans
- Do not include the word "Inhabitable" on site plan
- Setback Front Yard
- 30
- Setback Back Yard
- 30
- Setback Side Yard
- 30