Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

County of Tulare (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Date SolarAPP+ Accepted
45203
Any SolarAPP+ Restrictions
1
SolarAPP+ Restriction Notes

Note - they currently have an elevation restriction where projects over 3k elevation must still be submitted via the traditional means

SolarAPP+ Restrictions
Existing Systems,Existing Systems,Trenching,Other
How Many Plansets Required
3
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Ee Stamp Notes
Main Breaker Derates need EE Stamp on SLD SCE Utitlity requires EE stamp on SLD for Line Side Taps.
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category B

Snow Load
12
Snow Load Notes

N/A

Reducible Snow Load Allowed
0
Max Attachment Spacing
96
Structural Notes

Standard

Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
Yes
AC Disconnect Conditional Criteria
Battery jobs require special placards. Battery and lockable Disco go inside garage. [a past project, City of Beaumont. DCR 011521][a past project, City of Menifee. DCR 062220]
Electrical Load Calcs Required
Derates
Allowed POI
Line Side Taps,PV Breaker,Meter Adapter,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Battery jobs require special placards.

Separate ESS Disconnect Required
Local Disconnect,ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

STANDARD

Site

Show all areas of the property, including all buildings and structures

Custom Placards Required
1
Placards Notes

Permanent placards from placard page of approved plans

Ground mount

Ground Mount Fencing Required
Situational
Ground Mount Notes

* 07/30/19 - AHJ requiring 25' setback Front property line to array. - JH * 07/30/19 - AHJ requiring all structures of parcel to be on site plan - JH * **DESIGNER - MARK ALL DIMENSIONS OF ARRAY TO PROPERTY LINES** On ground mounts; Fencing NOT required on residential projects, but may be required on commercial or AG projects where animals (ie. dairy) can get close to the system.


NUANCE DQ due to 3rd party inspector


for records research

Setback Front Yard
25
Setback Side Yard
10
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the County of Tulare (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.