City of Boulder (CO)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2024 BUILDING AND SAFETY DIVISION ADMINISTRATIVE CODE
2024 INTERNATIONAL BUILDING CODE
2024 INTERNATIONAL RESIDENTIAL CODE
2024 UNIFORM MECHANICAL CODE
2024 UNIFORM PLUMBING CODE
2023 NATIONAL ELECTRICAL CODE
2024 INTERNATIONAL SWIMMING POOL AND SPA CODE
2024 CITY OF BOULDER ENERGY CONSERVATION CODE
2024 INTERNATIONAL FIRE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 1
- Revision Required
- 1
- Rough Inspection
- Footing inspection
- New Planset Required For Module Swap
- 1
Stamps
- Ee Stamp Required On SLD
- Yes - 10kW+
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
3' from ridge 18" from valley and hip ridge
Structural & loads
- Wind Speed
- 999
- Wind Notes
Per the Colorado Front Range Wind Table, the ultimate design wind speed shall be 165 mph for areas west of Broadway Street and 150 mph for areas east of Broadway Street. Use property search to final parcel specific snow load and wind speed requirements.
- Snow Load
- 999
- Snow Load Notes
Use property search to find parcel specific snow load and wind speed requirements. https://maps.boco.solutions/propertysearch/
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
All Jobs: Structural calcs and structural letter to indicate 165 mph v-ult wind velocity.
Over 10 kW: EE STAMPS ARE REQUIRED FOR SYSTEMS OVER 10KW
- Minimum Ground On Roof
- #6
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,PV Breaker,Line Side Taps,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Electrical Diagram
Standard
Ground mount
- Ground Mount Fencing Required
- No
- Ground Mount Notes
Soil Class: Clay
- Ground Mount Requires Soil Sample
- Soil Study