NEC Code Version2023
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural
Fire Setback EnforcedNo

Codes

NEC Code Version
2023
Code List

2018 INTERNATIONAL BUILDING CODE

2018 INTERNATIONAL RESIDENTIAL CODE

2018 INTERNATIONAL FIRE CODE

2018 INTERNATIONAL ENERGY CONSERVATION CODE

2018 INTERNATIONAL EXISTING BUILDING CODE

2018 INTERNATIONAL FUEL GAS COD

2018 INTERNATIONAL MECHANICAL CODE

2018 INTERNATIONAL PLUMBING CODE

2023 NATIONAL ELECTRICAL CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
Yes
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
1
Revision Required
No
Rough Inspection
Footing inspection
New Planset Required For Module Swap
No

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified

Fire setbacks

Fire Setback Enforced
No
Setback Notes

Standard

Structural & loads

Wind Speed
115
Wind Notes

Exposure Category C

Snow Load
30
Reducible Snow Load Allowed
Yes
Max Attachment Spacing
96
Structural Notes

Structural Calcs/Engineer letter required stating roof is adequate to support PV load.

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,PV Breaker,Load Side Taps,Line Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96

Battery / ESS

Unique Battery Placards Needed
No
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements
  • Must include installation manuals for inverters, charge controllers, and energy storage systems
Electrical Diagram
  • Must include fault current calculations from the power source to each component.
  • Electrical permit is required by the state. Please refer to the State of Colorado (DORA) (CO) for electrical requirements.
Custom Placards Required
No

Ground mount

Ground Mount Fencing Required
Mesh/Scrim