City of Westminster (CO)

Colorado Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

ANSI A117.1 - 2017

2021 INTERNATIONAL RESIDENTIAL CODE

2021 INTERNATIONAL BUILDING CODE

2021 INTERNATIONAL PLUMBING CODE

2021 INTERNATIONAL MECHANICAL CODE

2021 INTERNATIONAL FUEL AND GAS CODE

2021 INTERNATIONAL FIRE CODE

2021 INTERNATIONAL ENERGY CONSERVATION CODE

2021 INTERNATIONAL EXISTING BUILDING CODE

2021 INTERNATIONAL SWIMMING POOL AND SPA CODE

2023 NATIONAL ELECTRICAL CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
1
Revision Required
1
Rough Inspection
Footing inspection
New Planset Required For Module Swap
1

Stamps

Wet Stamps Required
None
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Per the Fire Departments amendments to the 2015 IFC, PV solar systems must meet the following requirements: * Panels shall not be placed closer than 2’0” to the ridge of any roof * Panels shall be placed no closer than 2’0” to the headwall at the top of any roof slope * Panels shall be placed no closer than 18” from any roof valley.

Structural & loads

Wind Speed
999
Wind Notes

Wind speed is location based. See "Wind Design Criteria" in the files to determine wind speed for each project. Wind exposure is designated as Exposure B.

Snow Load
30
Snow Load Notes

30 PSF for both roof and ground snow loads.

Reducible Snow Load Allowed
0
Max Attachment Spacing
96
Structural Notes

Standard

Minimum Ground On Roof
#6

Electrical

AC Disconnect Conditional Criteria
Provide all applicable warning and marking labels for AC and DC is connects as required. EQUIPMENT REQUIREMENTS Provide the following equipment information: If backfeed is breaker fed AC disconnect is not required
Electrical Load Calcs Required
Derates
Allowed POI
Line Side Taps,PV Breaker,Meter Adapter,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

SPECIFY : if the system is a stand-alone or interactive (grid-tied) system

Cover Page Notes

All Jobs [Project will be interactive (grid-tied) system]

Site

Call out all buildings/patios/structures on property

Roof Plan Notes

All Jobs [All permanent standoffs shall be mounted to structural members, mounted to the deck, and properly flashed to accommodate re-roofing without removal of standoffs. // Panels are not allowed to cover low profile attic vents, dryer vents, or bathroom exhaust vents - either these items will have to be relocated or the panels do not get installed at those locations]

Electrical Diagram

The clearances around all equipment noted above Conduit or cable type and size, i.e., nonmetallic, EMT, direct burial cable etc. Provide all calculations from modules to inverter and inverter to point of connection. Provide all applicable warning and marking labels for AC and DC is connects as required. EQUIPMENT REQUIREMENTS Provide the following equipment information: Labeling for residential applications, a label stating “CAUTION, SOLAR PHOTOVOLTAIC SYSTEM ON PREMISES” shall be placed at or within the main electrical service disconnect If backfeed is breaker fed AC disconnect is not required Supply side tap connectors must be service rated. Connectors must be listed on UL product IQ list Centerfed 120% allowed If backfeed is breaker fed AC disconnect is not required DO NOT ALLOW FOR BREAKER TIE-IN WITH SPLIT BUSS PANEL

Electrical Diagram Notes

All Jobs [Direct current (DC) conduit, wiring, and raceways shall be located below the solar array or a minimum of 24” below the roof sheathing. (611.3.)]

Custom Placards Required
1
Placards Notes

Metering identification in accordance with utility supplier. Print out of map of solar arrays on the roof to stick inside the main panel.


-Site map placards must be yellow with red or black letters

Ground mount

Ground Mount Fencing Required
No
Ground Mount Notes

Soil Class: Clay

Ground Mount Requires Soil Sample
Soil Study
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Westminster (CO) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.