City of Wheat Ridge (CO)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2024 International Building Code (IBC), excluding Chapter 1
2024 International Residential Code (IRC), excluding Chapter 1 and with the following appendices: BB, BE, BF, BO, CA, CB, CC, CE, CF, and CH
2024 International Fuel Gas Code (IFGC), excluding Chapter 1 but retaining Section 102
2024 International Mechanical Code (IMC), excluding Chapter 1 but retaining Section 102
2024 International Plumbing Code (IPC), excluding Chapters 1 and 14 but retaining Section 102
2024 International Energy Conservation Code (IECC), excluding Chapter 1 but retaining Sections C102, R102, C107, and R107
2024 International Existing Building Code (IEBC), excluding Chapter 1
2024 Swimming Pool and Spa Code (ISPSC), excluding Chapter 1 but retaining Sections 102 and 111
2024 International Private Sewage Disposal Code (IPSDC), excluding Chapter 1
2024 International Property Maintenance Code (IMPC), excluding Chapter 1 but retaining Section 102
2024 International Fire Code (IFC), excluding Chapter 1 but retaining Section 105 and adopting the following appendices: B, C, D, F, H, O
2023 National Electric Code, latest edition adopted by the Colorado State Electrical Board
Accessible and Usable Buildings and Facilities standard (ICC/ANSI A117.1)
Colorado Model Electric Ready and Solar Ready Code
Colorado Model Low Energy and Carbon Code, excluding Chapter 1 but retaining Sections C102, R102, C107, and R107
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Piloting
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching
- How Many Plansets Required
- 1
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 135
- Wind Notes
* Vult = 135 mph Vasd = 105 mph , 3 sec gust
- Snow Load
- 30
- Snow Load Notes
* 30 Lbs. Sq. Ft., 30 Lbs. Drift
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
**Structural Integrity: All projects, both residential and commercial, must have a documented and stamped letter from a licensed structural engineer in the State of Colorado, indicating that the existing structure has been reviewed and can adequately support all PV systems and meet all current applicable code requirements. If additional structural enhancements are required, detailed structural drawings and/or structural enhancements outlined in a report must be signed and sealed by a structural engineer and submitted with the permit.** **If structural enhancements are required for a commercial project, signed and sealed drawings must be logged in for a structural review. A separate permit will be issued for this work.** ** ** **SE digital stamps on corresponding PV pages & PE Letter / Calcs.**
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,Meter Adapter,Line Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
STANDARD
- Roof Plan
Details showing how the panels will be mounted. Calculations performed by a Colorado registered professional engineer must be submitted to substantiate that the structure can support the design loads specified in Chapter 16 of the International Building Code (IBC). Details and calculations for the panel connections to the roof must be included
- Electrical Diagram
Over 10 kW AHJ requires EE stamps Electrical line diagram: **City of Wheat Ridge now requires us to:** **Add notes to ELD:** **-verify cold water bond**
- Electrical Diagram Notes
**Cold water bond to gas pipe on customer side of gas meter** **(2) ground rods, unless connected to building Ufer**
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim