County of Adams (CO)
Codes
- NEC Code Version
- 2017
- Fire Code Version
- 2018 Building Code
- Code List
2018 INTERNATIONAL BUILDING CODE
2018 INTERNATIONAL ENERGY CONSERVATION CODE
2018 INTERNATIONAL FIRE CODE
2018 INTERNATIONAL FUEL GAS CODE
2018 INTERNATIONAL MECHANICAL CODE
2018 INTERNATIONAL PLUMBING CODE
2018 INTERNATIONAL RESIDENTIAL BUILDING CODE
2017 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 1
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 1
Stamps
- Ee Stamp Required On SLD
- Yes - 10kW+
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category C
- Snow Load
- 35
- Snow Load Notes
Double check snowload with link below
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
_**Stamp Tech Instructions:**_ Send this document to PE for snow load reference. Stamp tech needs to use this same doc upon PE delivery to verify snow load. **PE Instructions:** SE digital stamps on corresponding PV pages & PE Letter / Calcs. WS 110 Please reference link for snow load, https://seacolorado.org/docs/2016-Colorado-Design-Snow-Loads.pdf
- Minimum Ground On Roof
- #6
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Meter Adapter,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
No load-side taps allowed. Adams County will only accept mounting system that complies with 2018 IBC
- Electrical Diagram
Systems over 10kW require level bypass meter. No load-side taps allowed.
- Custom Placards Required
- 1
- Placards Notes
Metering identification in accordance with utility supplier.
Ground mount
- Ground Mount Fencing Required
- Yes
- Ground Mount Notes
Soil Class: Clay Ground mount solar array are required to be enclosed with 6' tall fence
- Ground Mount Requires Soil Sample
- Soil Study