Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2021 INTERNATIONAL RESIDENTIAL CODE 2021 INTERNATIONAL EXISTING BUILDING CODE 2021 INTERNATIONAL MECHANICAL CODE 2021 INTERNATIONAL PLUMBING CODE 2021 INTERNATIONAL ENERGY CONSERVATION CODE 2021 INTERNATIONAL PROPERTY MAINTENANCE CODE 2021 INTERNATIONAL FUEL GAS CODE 2023 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Testing
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 1
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 1
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 999
- Wind Notes
Minimum Ultimate Design Wind Speeds (Vult) vary between 115 and 225 mph. See our interactive winds map for wind speeds, snow loads and other site design criteria: https://maps1.larimer.org/gvh/?Viewer=LIL&run=Theme&theme=Wind%20and%20Snowload%20Information (https://maps1.larimer.org/gvh/?Viewer=LIL&run=Theme&theme=Wind%20and%20Snowload%20Information) To use the interactive map to determine the project's wind speed, search the site address and then click on the cloud icon when the site populates on the map.
- Snow Load
- 999
- Snow Load Notes
Roof Snow loads shall Not be Less than 30psf.
Snow load requirement changes based on elevation - please reference Larimer County wind & snow load map: https://maps1.larimer.org/gvh/?Viewer=LIL&run=Theme&theme=Wind%20and%20Snowload%20Information (https://maps1.larimer.org/gvh/?Viewer=LIL&run=Theme&theme=Wind%20and%20Snowload%20Information) ^search the address and then select the cloud icon that pops up under the site information to find out the site specific ground snow load.
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
ASCE 7-16 Should reference IRC, not IBC See the Wind Load, Snowload, and another references in the attached file "structural_design_information" Check website for wind and snow load for specific location: https://maps1.larimer.org/gvh/?Viewer=LIL&run=Theme&theme=Wind%20and%20Snowload%20Information
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,Meter Adapter,PV Breaker,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Panel spec sheets with UL listing per code UL1703, or UL 61730 and 61730-2 must be included in plans.
- Site
See __Plot Plan__ in file section
- Attachment Detail
* Mounting system must comply with 2018 IBC * RUN UNIRAC U BUILDER FOR ALL UNIRAC RAIL SYSTEMS
- Electrical Diagram
Standard
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- No
- Ground Mount Notes
Indicate the distances from the proposed solar panels to the property lines. Make sure any waterways on the property are shown and the distance from the proposed solar panels to the centerline of the waterway is indicated. Any property zoned O-Open will require setbacks of 25 ft on all sides. The Larimer County Land Use Code requires an additional 5 feet between the required setback and any building or structure. When that 5-foot requirement is not met, a setback certification performed by a licensed Colorado surveyor will be required.
12/29 for nuance projects:
add spacing/layout for this earth anchoring system
- Setback Front Yard
- 25
- Setback Back Yard
- 25
- Setback Side Yard
- 25