County of Pueblo (CO)

Colorado Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural
Fire Setback Enforced0

Codes

NEC Code Version
2023
Code List

2021 INTERNATIONAL BUILDING CODE

2021 INTERNATIONAL RESIDENTIAL CODE

2021 INTERNATIONAL MECHANICAL CODE

2021 INTERNATIONAL PLUMBING CODE

2021 INTERNATIONAL FUEL GAS CODE

2021 INTERNATIONAL ENERGY CONSERVATION CODE

2021 INTERNATIONAL EXISTING BUILDING CODE

2021 INTERNATIONAL SWIMMING POOL AND SPA CODE

2021 INTERNATIONAL FIRE CODE

2023 NATIONAL ELECTRICAL CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Existing Systems,Trenching,Derate
How Many Plansets Required
1
Revision Required
0
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
0
Setback Notes

Standard

Structural & loads

Wind Speed
115
Wind Notes

Exposure Category C

Snow Load
27
Snow Load Notes


Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

Standard

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
PV Breaker,Meter Adapter,Line Side Taps,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

Location of Existing Structure(s) With Distances from Structure(s) to Front, Sides, & Rear Property Lines, and Distance to Other Existing Structure(s) &/or Proposed Structure(s) Please note on Site Plan if job is flush or ground mounted, and also note that roof mounting does not exceed angle of roof. Per Pueblo County, please use engineer scale on plans instead of architect scale. Plot plans to be drawn to an even numbered engineer scale (1 = 10', 20', 30', etc.) containing the following information on paper no larger than 11 x 17 in size (Note: Arial view maps will not be accepted.) 1. Assessor's Parcel Number2. Dimensions of the Parcel3. Easements/Building Setback Lines (if applicable)4. Address of Property5. Road Name(s)6. North Arrow7. Designated Scale8. Location AND exterior dimensions of proposed structure(s) with distances from structure(s) to front, sides, & rear property lines and distance to/separation between other existing structure(s) &/or proposed structure(s)9. Project routing sheet from the Pueblo Regional Building Department Please see attachment for Plot Plan example.

Site

scale on site plan to engineer scale per AHJ requirements.

Electrical Diagram

Standard

Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the County of Pueblo (CO) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.