Southern Colorado Building Department (CO)
Codes
- NEC Code Version
- 2023
- Code List
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL RESIDENTIAL CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL PLUMBING CODE
2021 INTERNATIONAL FUEL GAS CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL EXISTING BUILDING CODE
2021 INTERNATIONAL SWIMMING POOL AND SPA CODE
2021 INTERNATIONAL FIRE CODE
2023 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Testing
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 1
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Electrical,Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
2018 setbacks but that is from the ridge to anything withing the setback area including attachment and racking. try to provide a minimum of 20" from ridge to module to allow attachment.
Structural & loads
- Wind Speed
- 120
- Wind Notes
Exposure Category C
- Snow Load
- 999
- Snow Load Notes
38 PSF for elevations above 7000 ft. 27 PSF for elevations below 7000 ft.
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 48
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,PV Breaker,Load Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
- Cantilever specs & max. foot spacing need to be highlighted & separately marked on its own page in plans (separate from the attachments/mounting detail page) & structural calcs
- NEED INTERGRATED GROUND AND BONDING CERT LETTER SHEET FOR UNIRAC FOR ALL MODULES.
- Please add mounting system span chart
- Add Rock-It railless UL2703 cert for Rock-It projects to plans
- Notate location of Existing Structure(s) With Distances from Structure(s) to Front, Sides, & Rear Property Lines, and Distance to Other Existing Structure(s) &/or Proposed Structure(s)
- Assessor's Parcel Number (http://www.co.pueblo.co.us/cgi-bin/webatrallbroker.wsc/atrpropertysearchall.html (parcel look up))
- Dimensions of the Parcel
- Easements/Building Setback Lines (if applicable)
- Address of Property
- Road Name(s)
- North Arrow
- Designated Scale
- Location AND exterior dimensions of proposed structure(s) with distances from structure(s) to front, sides, & rear property lines and distance to/separation between other existing structure(s) &/or proposed structure(s)
- Project routing sheet from the Pueblo Regional Building Department
- Need product spec sheets for all equipment to be used, roof j-box, conductor/cord grip strain relief, meter, disconnect, etc.
- Cover Page Notes
All Jobs [Wind Speed : 120 MPH Exposure Category C // Snow Load: // 38 PSF for elevations above 7000 ft. // 27 PSF for elevations below 7000 ft.]
- Site Notes
All Jobs [TOTAL ROOF AREA RIDGE SETBACK CALCS: // TOTAL ROOF AREA: XXXX SQ FT // SINGLE MODULE AREA: XX SQ FT // TOTAL NUMBER OF MODULES // TOTAL AREA OF MODULES: XXXX SQ FT // ROOF COVERAGE XX% // FIRE SPRINKLERS: Y/N // ALL ROOF MOUNTED PANELS WILL BE MOUNTED FLUSH TO THE ROOF.]
- Roof Plan
Example
- Attachment Detail
* Attachment detail must match actual layout * Plans need an attachment drawing for each array, even if the attachment is the same
- Attachment Detail Notes
All Jobs [MAX CANTILEVER IS 1/3 OF THE ATTACHMENT SPACING // MAX CANTILEVER IS 16" (48" X 1/3 = 16")]
- Electrical Diagram
- Line/Load side taps are allowed; however piercing taps are not allowed must be Polaris type taps to be approved.
- The conductor size through the production meter is either required to be a minimum of #6 copper or have reducing lugs installed in the jaws of the meter socket. If reducing lugs are to be used, they must be called for in the plan set.
- The production meter to be used needs to be highlighted on the product sheet per SoCOBD policy.
- The production meter socket is required to be 200 amp per power company requirements. BHE
- Detached structure require GEC (show on the line diagram)
- Electrical Diagram Notes
If PM is required(BHE) 200A production meter spec sheet line and load wiring must match ELD, Wiring in plan set.
Ex. MILBANK 200A PM spec lists #6 line/load wire
- Label Page
- Need spec sheets for NEC 690.43 showing compatibility of module to racking
- If the panel where are tying in our PV does not have a main breaker, include the following label for that enclosure:
- WARNING: This equipment fed by multiple sources total rating of all overcurrent devices excluding the main supply overcurrent device shall not exceed ampacity of the busbar
- Custom Placards Required
- 1
- Placards Notes
If the equipment is not within line of sight with the Utility meter placards are required.
Ground mount
- Ground Mount Fencing Required
- No
- Ground Mount Notes
Site Plan:
Dimensions of the solar installation and the residence need to be labeled
PL dimensions need to match parcel map
Include easements
11' pier spacing or under is required
Height shown in feet need from ground to highest point of array. (Cannot exceed 6')
NEED SNOW AND WIND LOAD CALCULATIONS PER IronRidge/Nuance, follow AHJ snow load and wind speeds for iron ridge/nuance deliverables; please add iron ridge/nuance pages to plans for GMs.
The dimensions of all structures, both existing and proposed must be shown.
Must label both existing and proposed structures.
Setbacks are required for the existing structures as well as any proposed structures.
The scale must be an ENGINEER scale: 1" = 10', 1"= 20', etc.
- Per AHJ, please use engineer scale on plans instead of architect scale. Plot plans to be drawn to an even numbered engineer scale (1" = 10', 20', 30', etc.) containing the following information on paper no larger than 11" x 17" in size (Note: Arial view maps will not be accepted.)
For structures over a 1000 sqft, AHJ requires erosion control plan. See attached file for information on how to build one.