Town of Platteville (CO)
NEC Code Version2023
Fire Code VersionNot Enforced
Wet Stamps RequiredDigital Structural
Fire Setback Enforced0
Codes
- NEC Code Version
- 2023
- Fire Code Version
- Not Enforced
- Code List
2018 THE INTERNATIONAL BUILDING CODE 2018 THE INTERNATIONAL RESIDENTIAL CODE 2012 THE INTERNATIONAL FIRE CODE 2018 THE INTERNATIONAL PLUMBING CODE 2018 THE INTERNATIONAL PROPERTY MAINTENANCE CODE 2018 THE INTERNATIONAL EXISTING BUILDING CODE 2018 THE INTERNATIONAL SWIMMING POOL AND SPA CODE 2012 THE INTERNATIONAL ENERGY CONSERVATION CODE 1997 THE UNIFORM CODE FOR THE ABATEMENT OF DANGEROUS BUILDINGS 2023 THE NATIONAL ELECTRIC CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 1
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 0
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category C Seismic design category B
- Snow Load
- 30
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Meter Adapter,Load Side Taps,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Electrical Diagram
Standard
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim