City of Stamford (CT)
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2021 INTERNATIONAL BUILDING CODE
2017 INTERNATIONAL CODE COUNCIL ANSI A 117.1. ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES
2021 INTERNATIONAL EXISTING BUILDING CODE
2021 INTERNATIONAL PLUMBING CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2020 NATIONAL ELECTRICAL CODE
2021 International Residential Code portion of the 2022 Connecticut State Building Code
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- Other (See Submission Notes)
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 119
- Wind Notes
Exposure Category B
- Snow Load
- 30
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,PV Breaker,Load Side Taps,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Torque Values Upload a listing of all torque values and have a properly calibrated torque wrench and screwdriver on site for inspections or upload a Notarized letter, Signed by the Licensed Electrician performing the work on his/her letterhead, containing a complete list of components torqued, their torque values and stating that All equipment has been torqued to factory or manufacturers specifications. ALL breakers and equipment shall be torqued per manufacturer's specifications and/ or Annex I of the NFPA-70-2011.
- Site
show roof access points on site plan
- Roof Plan
* Each photovoltaic array shall be limited to 150 feet by 150 feet (45 720 by 45 720 mm). Multiple arrays shall be separated by a clear access pathway not less than 3 feet (914 mm) in width. * Indicate the ground access points on plans
- Custom Placards Required
- 1
- Placards Notes
2 Map Placards
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim