City of Cape Coral (FL)
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2023 8TH EDITION FLORIDA BUILDING CODE: BUILDING
2023 8TH EDITION FLORIDA BUILDING CODE: RESIDENTIAL
2023 8TH EDITION FLORIDA BUILDING CODE: MECHANICAL
2023 8TH EDITION FLORIDA BUILDING CODE: PLUMBING
2023 8TH EDITION FLORIDA BUILDING CODE: FUEL GAS
2023 8TH EDITION FLORIDA BUILDING CODE: ENERGY CONSERVATION
2023 8TH EDITION FLORIDA BUILDING CODE: EXISTING BUILDING
2023 8TH EDITION FLORIDA BUILDING CODE: ACCESSIBILITY
2023 8TH EDITION FLORIDA FIRE PREVENTION CODE (NFPA)
2020 NATIONAL ELECTRIC CODE (NEC)
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 1
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 1
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Ee Stamp Notes
Digitally Verified Signature
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
2020 7TH EDITION FLORIDA FIRE PREVENTION CODE
Structural & loads
- Wind Speed
- 160
- Wind Notes
Exposure Category C ; HVHZ
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 48
- Structural Notes
SE / EE digital stamps on all PV pages, PE Letter / Calcs & FL Statute. WS 160
Digitally Verified Signature
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,PV Breaker,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
- BOS Restrictions
5/16/24 Taps must be made with UL list and NEC 230.46 compliant connectors. IPC 250-4/0. See spec sheets in files section.
(N) LINESIDE TAP VIA UL LISTED CONNECTORS SUITABLE FOR USE ON THE LINE SIDE OF THE SERVICE EQUIPMENT
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
LST SPEC SHEET ADD TO LST PROJECTS
- Roof Plan Notes
All Jobs [Layout subject to change.]
- Electrical Diagram
LINE SIDE TAP
- LEADER MUST READ (N)LINESIDE TAP VIA UL LISTED CONNECTORS SUITABLE FOR USE ON THE LINE SIDE OF THE SERVICE EQUIPMENT
- EGC MUST BE MIN #6AWG
- BOND NEUTRAL AND GROUND IN FUSED DISCO, REMOVE EGC FROM DISCO TO POI
- Electrical Diagram Notes
All Jobs [Interconnection Method subject to change]
- Label Page
FLORIDA 2020 EMERGENCY CAD BLOCK
CAUTION: MULTIPLE SOURCES OF POWER verbiage on the placard
- Custom Placards Required
- 1
- Placards Notes
Plastic engraved placards are required for AC disconnect and Inverter
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim