City of Deltona (FL)
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2023 8TH EDITION FLORIDA BUILDING CODE: BUILDING
2023 8TH EDITION FLORIDA BUILDING CODE: RESIDENTIAL
2023 8TH EDITION FLORIDA BUILDING CODE: MECHANICAL
2023 8TH EDITION FLORIDA BUILDING CODE: PLUMBING
2023 8TH EDITION FLORIDA BUILDING CODE: FUEL GAS
2023 8TH EDITION FLORIDA BUILDING CODE: ENERGY CONSERVATION
2023 8TH EDITION FLORIDA BUILDING CODE: EXISTING BUILDING
2023 8TH EDITION FLORIDA BUILDING CODE: ACCESSIBILITY
2023 8TH EDITION FLORIDA FIRE PREVENTION CODE (NFPA)
2020 NATIONAL ELECTRIC CODE (NEC)
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 1
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Ee Stamp Notes
FL Statute Letter Required
Digitally Verified Signature
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
* Provide clear setbacks on both sides of the horizontal ridge. (R324.6.2) * Not fewer than two pathways, on separate roof planes from the lowest roof edge to the ride and not less thank 36 inches wide, shall be provided on all buildings
Structural & loads
- Wind Speed
- 145
- Wind Notes
Exposure Category C
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 48
- Structural Notes
Digitally Verified Signature
*NEW* This AHJ has been kicking us back when engineer calls out different engineer letter information than the plans call for, ie. 2 lags vs 4 lags, embedment, etc..
*NEW* If there is any difference between what the PE calls for and the plans show, please contact designer to revise the planset to comply with what PE calls for. - SPECIFICALLY with embedment. Some plansets erroneously show 2" embedment when letter calls for 2.5" - please kick this back to the designer via. ticket or teams message to fix.
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,Load Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 75
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
#NFZ_ALL#
- Site Notes
**********Whenever we get a rejection rework please escalate the project to staff************
- Roof Plan
Show the attachment points on roof plan.
- Electrical Diagram
ALL JOBS:
- Show wire size of utility feeders
BATTERY JOBS:
- Provide sizes of other breakers on main service busbar
LST
- When the POI is on the supply (line) side we must notate that the neutral and ground are bonded together
If we're utilizing SUM OF ALL BREAKERS as a POI - reflect the 2020 NEC code referencing it on your SLD with a leader to the breaker.
IX needs to be notated on plans (Ie. Compliant to Sum of all breakers... 120%... etc)
General note that states "Electrical portion shall comply with Article 250 grounding requirements"
- Label Page
Special Label is required for ALL jobs for this AHJ (see Volusia County label below).
Label must match exactly in color and verbiage.
Provide label outlining installing contractors name, and emergency contact number, per section 11.12, of NFPA-1
- Custom Placards Required
- 0
- Placards Notes
- N/A
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim