County of Bay (FL)
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2023 8TH EDITION FLORIDA BUILDING CODE: BUILDING
2023 8TH EDITION FLORIDA BUILDING CODE: RESIDENTIAL
2023 8TH EDITION FLORIDA BUILDING CODE: MECHANICAL
2023 8TH EDITION FLORIDA BUILDING CODE: PLUMBING
2023 8TH EDITION FLORIDA BUILDING CODE: FUEL GAS
2023 8TH EDITION FLORIDA BUILDING CODE: ENERGY CONSERVATION
2023 8TH EDITION FLORIDA BUILDING CODE: EXISTING BUILDING
2023 8TH EDITION FLORIDA BUILDING CODE: ACCESSIBILITY
2023 8TH EDITION FLORIDA FIRE PREVENTION CODE (NFPA)
2020 NATIONAL ELECTRIC CODE (NEC)
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 1
- New Planset Required For Module Swap
- 1
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Ee Stamp Notes
FL Statute letter required
Digitally Verified Signature
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 141
- Wind Notes
Exposure Category C ; HVHZ
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Calculations should include: at minimum, the address of the property, wind speed it’s evaluated for, the demand load per roof zone, the space between mounts per roof zone, type of mounts to be used, and layout of mounts/rails and mounts, all for the specific roof.
Digitally Verified Signature
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Line Side Taps,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Plan Set Requirements
Add the following to the title block under staff signature:
State of Florida
Fill out B37 Florida Product Approval form located in files section.
- Roof Plan
Need to show rail and attachment points on roof plan
When blocking is indicated as required, please indicate where blocking need to be added
- Attachment Detail
- Electrical Diagram
Centerfed 120%: EE Stamp Required Pictures of MSP and Breakers required, deadfront off No breaker tie ins on a hot bus.
- Label Page
FLORIDA - 2020
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim
- Ground Mount Notes
* The limits of clearing, grading, and area of land disturbance must be clearly identified and distinguished from those areas of trees and understory which are to be preserved
* Erosion and Sedimentation Control measures are required to be shown on site plan. Indicate at a minimum the proposed locations for the installation of Silt Fence and a stone Construction Entrance.
* Provide the existing Topographic Contours, and any relevant spot elevations, of the lot and any proposed grade changes based on NAVD 88 datum. Show both existing and proposed drainage patterns
* Indicate if the proposed building/dwelling/accessory structure is located within the 100-year Floodplain.
* Provide the existing Base Flood Elevation (BFE), existing Design Flood Elevation (DFE), and the proposed Finished Floor Elevations (FFE) along with the proposed final grade elevations at the building corners and at the mid point of all exterior walls
* Provide spot elevations and invert elevations of the nearest drainage structure or ditch line that will collect and convey stormwater runoff
* show the location of any streams, ponds, surface waters, or wetlands on the lot or within 100-linear feet of the lot's boundary lines. Show wetland area setback and buffer distances from wetlands noting that there is a minimum 30-foot buffer from wetlands and shorelines
* Identify the locations of all existing and proposed underground utilities. This would include water service line connections and meter boxes, irrigation system service line connections and meter boxes, sanitary sewer lines and cleanouts, and on-site septic systems, drain fields, or wells.
* Identify and show onsite easement, both existing and proposed.
* Provide locations of geotechnical investigation soil borings and hand augers, if applicable
* Provide the post-development impervious surface ratio (ISR) calculation (percentage of impervious coverage) and maximum ISR allowed by Ordinance.