County of Martin (FL)
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2023 8TH EDITION FLORIDA BUILDING CODE: BUILDING
2023 8TH EDITION FLORIDA BUILDING CODE: RESIDENTIAL
2023 8TH EDITION FLORIDA BUILDING CODE: MECHANICAL
2023 8TH EDITION FLORIDA BUILDING CODE: PLUMBING
2023 8TH EDITION FLORIDA BUILDING CODE: FUEL GAS
2023 8TH EDITION FLORIDA BUILDING CODE: ENERGY CONSERVATION
2023 8TH EDITION FLORIDA BUILDING CODE: EXISTING BUILDING
2023 8TH EDITION FLORIDA BUILDING CODE: ACCESSIBILITY
2023 8TH EDITION FLORIDA FIRE PREVENTION CODE (NFPA)
2020 NATIONAL ELECTRIC CODE (NEC)
- ASCE Code Specification
- ASCE 7-22
SolarAPP+ & submittal
- How Many Plansets Required
- Other (See Submission Notes)
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Ee Stamp Notes
Digitally Verified Signature
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
AHJ REQUESTED ROOF ACCESS POINT & ACCESS AND PATHWAYS
Structural & loads
- Wind Speed
- 160
- Wind Notes
Exposure Category C
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 48
- Structural Notes
SE & EE digital stamps on all PV pages, FL Statute, PE Letter & Calcs.
For Engineer:
- 2023 8th Edition FBC, 2023 8th Edition FRC
- ASCE 7-22, and 2018 NDS Risk Category II Wind Speed: 160 MPH Ult $ 124 mph nom (3 sec gust), Exposure Category C
- Partially/fully Enclosed Method
- Ground Snow Load - 0
- Changes needs to be clouded in red
Existing Systems
- Provide a letter verify the existing roof system, with the additional loading (gravity and uplift), will be able to structurally support the panels and all additional loading.
- The letter must be signed, dated, and sealed by the Architect of Record (F.S. 481.221(2)) or the Engineer of Record (F.S. 471.025(1)). 7th Edition (2020) FBC/Residential 107.3
Digitally Verified Signature
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Line Side Taps,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
See Structural Notes FLATTEN PLANS BEFORE SENDING TO THE ENGINEER All revisions must be clouded in black ink
- Roof Plan
Setbacks required **AHJ REQUESTED ROOF ACCESS POINT & ACCESS AND PATHWAYS**
- Custom Placards Required
- 0
- Placards Notes
Proper stickers are required to be in place
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim