Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

County of Miami-Dade (FL)

Florida Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2020
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced1

Codes

NEC Code Version
2020
Fire Code Version
2018 Building Code
Code List

2023 8TH EDITION FLORIDA BUILDING CODE: BUILDING

2023 8TH EDITION FLORIDA BUILDING CODE: RESIDENTIAL

2023 8TH EDITION FLORIDA BUILDING CODE: MECHANICAL

2023 8TH EDITION FLORIDA BUILDING CODE: PLUMBING

2023 8TH EDITION FLORIDA BUILDING CODE: FUEL GAS

2023 8TH EDITION FLORIDA BUILDING CODE: ENERGY CONSERVATION

2023 8TH EDITION FLORIDA BUILDING CODE: EXISTING BUILDING

2023 8TH EDITION FLORIDA BUILDING CODE: ACCESSIBILITY

2023 8TH EDITION FLORIDA FIRE PREVENTION CODE

2020 NATIONAL ELECTRIC CODE

ASCE Code Specification
ASCE 7-22

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
Other (See Submission Notes)
Revision Required
1
Rough Inspection
Rough Electrical
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Digital Structural,Digital Electrical
Structural Calculations Required
Yes
Ee Stamp Notes

Digitally Verified Signature

Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Fire Set Backs are 2018, but the AHJ requires hurricane zones on roof which closely mimic the 2015 building code

Note: The wind zones and the fire set backs are two separate items

Structural & loads

Wind Speed
175
Wind Notes

Plan required to address HVHZ wind pressures HIGH-VELOCITY HURRICANE ZONE (HVHZ) PV REQUIREMENTS

Buildings and structures located within the high-velocity hurricane zone shall comply with the provisions of Sections 1605, 1607, 1611, 1616 through 1626.

The High Velocity Hurricane Zone (HVHZ) consists of Miami-Dade and Broward Counties.

Sections 1512 through 1525 set forth the minimum requirements for the installation of roofing components, roofing systems and roofing assemblies and the waterproofing there of.


24" max attachments span is the most used span for this AHJ


CLEARLY SHOW IN THIS SHEET THE WIND PRESSURE VALUES FOR EACH ZONE. MAKE SURE THE WIND PRESSURES INCLUDE THE COEFFICIENTS FOR ARRAY EDGE FACTOR (GAMMA E), PRESSURE EQUALIZATION FACTOR (GAMMA A), AND THE PRESSURE COEFFICIENT FOR EACH ROOF WIND ZONE. FBC SECT 107.2.1. (See attachment example)

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
48
Structural Notes

SE / EE digital stamps on all PV pages, FL Statute & PE Letter / Calcs. All stamped by the same PE. Deliver stamped PV plans pages SEPERATED in one ZIP file.

Digitally Verified Signature

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Load Side Taps,Line Side Taps,PV Breaker
Panel Schedule Required
Partial Home Backup
Service Ground Requirements

Line side taps: remove the grounding conductor from the MSP to the disconnect. 

Temperature Rating
90
De Rating Ampacity
0.96

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

#NFZ_ALL#

APPROVED PLANSET FOR CORRECT REFERENCE



PV modules, Racking, connection, and Stand-offs shall be rated for the wind pressure zones they are installed in.

Projects in this AHJ will need modules that can withstand high velocity hurricane zones (HVHZ).


If Goodleap we must swap finance to be able to use the below modules.

The only modules that we have available that can work in this area are Canadian Solar CS3N-400MS (as of 2-16-26).


Rated mods previously used: Silfab 380W, CS3N-395MS, Mission 345-350W, Jinko 405W, Aptos 365W. Modules must be rated at 5000 PA or higher.


Rail-less is NOT allowed. PV modules in portrait orientation ONLY (landscape is not allowed).


Junction box spec sheets required!


Miami-Dade NOAs are required for attachments and sealant (to be attached to planset). Located in FILES section at bottom. [The following attachments have NOAs/FPAs as of 2/10/26]

Comp Shingle: Unirac Stronghold with Butyl & K2 Multimount

Rolled Comp: Chem Curb

Tile Roof: Unirac Flashkit TR

Standing Seam Metal: S-5-N Clamp

Metal Roof: RT Mini II, SCI Attachments


Miami Dade requires corrections to be clouded

Miami Dade requires a response/revision letter from engineering that addressed the comments.


Ironridge QBase attachments to be used for rolled comp roofs (no tilt kits allowed).


Add span table for attachments being used. 6/6/25

Remove layers/flatten planset in Acrobat before sending for stamps 6/6/25

Cover Page


Cover Page Notes

All Jobs [THIS SYSTEM DESIGNED WITH: // WIND SPEED: 175 // WIND EXPOSURE: C // CATEGORY II // 3 SECOND GUST]


Site Notes

All Jobs [THIS SYSTEM DESIGNED WITH: // WIND SPEED: 175 // WIND EXPOSURE: C // CATEGORY II // 3 SECOND GUST]

Roof Plan

Roof pressure/wind zones are required to be calculated or presented correctly on plans.




Add multileaders pointing at roof attachment, and rafter/truss.


Show dimensions of wind zones (3 ft), from array (all sides) to all roof edges (2xH distance required from panel edge to the edge of the roof (2 times the height that the panel sites above the roof, i.e., if the panel is 5 inches above the roof, it must be 10 inches from the edge of the roof. Demonstrate this measurement on the plans to show compliance)


If more than one attachment type is used on the project Identify them each with a leader.

Roof Plan Notes

All Jobs [THIS SYSTEM DESIGNED WITH: // WIND SPEED: 175 // WIND EXPOSURE: C // CATEGORY II // 3 SECOND GUST // JUNCTION BOX SHALL BE SUITABLE FOR WET LOCATION]


ROOF MATERIAL:

BUILDING HEIGHT:

Attachment Detail

Add a multileader pointing at attachment "FLASHING AND KARNAK SEALANT" for tiles roof.

Add a multileader pointing at attachment "FLASHING AND M1 SEALANT" for shingle/metal roof.


NOA is required for sealant (M1 sealant for comp shingles and metal roofs, GAF flex sealant, PG500, or Karnak KarnaFlex for tile roofs.


Provide roof flashing detail drawing for penetrations of the solarhook.


UNIRAC SM STANDARD RAIL to be used for UNIRAC attachments.

XR100 RAIL to be used for Jinko attachments (Obase)

Attachment Detail Notes

2xH distance required from panel edge to the edge of the roof (2 times the height that the panel sites above the roof (i.e., if the panel is 5 inches above the roof, it must be 10 inches from the edge of the roof)

Electrical Diagram

TLD TO REFLECT:

Intersystem bonding terminal and metal water pipe bonding (example in files section).

Show feeder size between MSP and utility meter


Line side taps:

Remove the grounding conductor between AC Disconnect and POI.


If using a subpanel to relocate loads, plans need to call out those loads specifically. Using "to other loads" is NOT acceptable.


MPUs:

PROVIDE GROUNDING ELECTRODE CONDUCTOR SIZE. NEC 250.66. MINIMUM #4 AWG.

PROVIDE GROUND RODS DIMENSIONS/SIZE ACCORDING TO NEC 250.52(A)(5).

SERVICE RISER DIAGRAM REQUIRED (WHEN A NEW MPI IS ADDED or an MPU is called out)

IF THERE IS A GENERATOR ON SITE SHOW THEM (Doesn't matter if it is an automatic or manual generator *plug in style*)


Make sure that the loads being backed up by battery is properly depicted on the planset.

Electrical Diagram Notes

All Jobs [AC DISCONNECT IS SERVICE ENTRANCE RATED // JUNCTION BOX SHALL BE SUITABLE FOR WET LOCATION]

Label Page

FLORIDA-2020 block in CAD

Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the County of Miami-Dade (FL) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.